Aerospace Metal Fabrication - Points to Consider

Material certification, traceability and tight tolerance inspection govern aerospace fabrication from cutting to final NDT.

14 Mar 20233 min read
Aerospace Metal Fabrication - Points to Consider

Steel fabrication has applications in multiple industries, such as the mining industry. The aerospace industry is also hugely dependent on metal fabrication work since it requires a lot of tools and technology to build aerospace infrastructure. Aerospace fabrication requires high precision and tight tolerances with the finest quality materials, skilled personnel with extensive experience utilizing state of the art equipment and technology, and the capability to perform complex assemblies and integration that meet the most stringent industry regulations. It combines traditional pipe fabrication methods and assembly techniques with advanced material assembly, production processes, and procedures that differ from other metal fabrication processes. As a result, there are certain points to be considered when evaluating fabricators for an aerospace sheet metal fabrication project. This blog will elaborate further in this regard.

Prior Fabrication Experience

The success of an aerospace fabrication project will significantly depend on the prior experience of the fabricator. Upfront, the company must have the reputation and experience in the field to manage similar projects efficiently and effectively and to avoid costly mistakes. Workforce experience should also be evaluated as to how closely expertise and skill set relates to the fabrication of parts and components for aerospace. Finally, potential aerospace fabricators should be checked for references as a reputable and experienced heavy steel fabrication company will have many success stories.

Capabilities of Fabricator

Aerospace Metal Fabrication - Points to Consider
K999 workshop, Rayong

Equipment and resources are vital to the successful completion and outcome of any fabrication project. To meet the necessary performance and production standards, aerospace metal fabrication requires cutting edge design and manufacturing technology. With regard to precision manufacturing of aerospace parts, fabricators should be considered that utilize fully automated CNC programmed technologies such as cutting, stamping, punching etc. Automation increases and ensures that the highest quality standards are met in the manufacture of parts, components, and subassemblies.

Usage of Materials

Since some fabrication shops specialize in working with certain raw materials, it is necessary to ascertain if their expertise aligns with the customer’s material requirements. With regard to the modern aerospace industry, it’s highly likely that expertise would be in working with aluminum, and aluminum alloys and composites. This is due to the fact that aluminum’s lightweight, good formability and alloying, and relatively low cost make it a choice material in the fabrication of a variety of parts and components used in the manufacture of aircraft.

Standards and Compliance

Fabrication of parts and components for aircraft must be in compliance with national and international standards and regulations that govern the design and manufacture of aircraft. All parts must meet fabrication quality management standards for airworthiness in accordance with approved procedures. Governing authorities such as the Federal Aviation Administration (FAA) in the US, the European Aviation Safety Agency (EASA), and Transport Canada oversee and enforce regulations and approval processes for design, fabrication, and production standards. The fabricator should be knowledgeable of and in compliance with the regulations and procedures that govern the fabrication of aircraft parts.

Closing Statement

The aerospace industry is not simply about aircraft or spacecraft, it comprises both aeronautics and astronautics. The design, fabrication, and assembly of flying machines are an enormous undertaking, especially as it involves large numbers of human lives who are at risk if fabrication is not done properly. In an increasingly interconnected world, there are more expectations from fabrication companies with regard to its downstream processes, specifically its capability to crate and ship after product assembly is completed. Thus, with respect to the aerospace industry, fabrication companies should have a single mantra, best quality with zero errors!

Further reading

Follow project tracking across the wider market on Project Atlas Intel.

Calculation tool

Run the numbers for this yourself with the free materials and metallurgy articles from Engineering Toolbox Australia. Treat the result as a first check, then confirm the final design with your engineer.

Share this article LinkedIn X Facebook

How K999 can help

Fabrication capacity behind the article

Articles in this section describe work we run every week in Rayong: cutting, forming, welding and assembly, under cover and in the yard, with the documentation that goes with it.

Structural steel fabrication
  • 01

    Two workshops totalling more than 33,000 m² plus an 80,000 m² assembly yard at Sattahip.

  • 02

    Structural steel fabrication to 10,000 tonnes a year, with the largest single module built at 2,500 tonnes.

  • 03

    Blast, prime and paint before dispatch, with dimensional reports issued against the approved drawings.

Request for quotation

Need fabricated steel to that standard?

Every enquiry is answered within 48 hours by our estimating team in Rayong. The priced quotation follows once drawings, quantities and standards are confirmed. Stainless steel fabrication, structural steel fabrication, pipe spooling, pressure vessels, steel tanks, mining equipment and conveyors, pig launchers, chutes and hoppers, send the package and we will price it.

Before you request a quotation

Steel fabrication quotation questions

What structural steel fabrication, pressure vessel and pipe spooling packages cost, what to send with an enquiry, and how delivery to site works.

Structural steel fabrication is priced from the section and plate tonnage, the detailing and drawing hours, welding and fitting manhours, NDT requirements, blast and coating system, packing and freight. Grade matters as much as weight: AS/NZS, ASTM, JIS and BS sections carry different mill prices, and heavy built up members take longer than rolled sections. Our Rayong workshop produces around 10,000 tonnes of structural steel fabrication a year, so a clear bill of materials is usually enough to price. Send the drawings and we answer within 48 hours; the priced quotation follows once quantities, standards and delivery dates are confirmed.

For steel fabrication work, send the drawings or IFC package, a bill of materials with material grades, the welding and NDT requirements, the coating specification, the delivery port and your site dates. Add the inspection and test plan, any third party inspection requirement, and whether trial assembly or match marking is needed. Where drawings are still in progress, a scope list with sizes, quantities and duty is enough to start, and the estimate is refined once the final package arrives. Every enquiry is answered within 48 hours, and the priced quotation is issued after scope, standards and quantities are confirmed.

Yes. Pressure vessel fabrication is carried out to ASME Section VIII Div. 1 under our ASME U stamp No. 43,462, or to AS/NZS and BS where the project specifies, covering separators, air receivers, water drums, waste heat recovery units and pig launchers. Steel tanks for fuel, biofuel, chemical, water and food duty are designed in house with our E Tank programme to API, ASME, BS and AS/NZS. Because structural steel, vessels, tanks and their supports are built in the same workshops, one enquiry can cover the vessel package, the tank package and the structural steel that carries them, with a single coating and documentation system and one shipment.

Steel fabrication Australia packages are scheduled from a 33,000 m2 Rayong yard with an 80,000 m2 assembly yard inside Sattahip port, so fabrication, trial assembly, blasting, coating and packing run in one place. Programme length depends on tonnage, material lead times, the coating system and inspection scope, and it is confirmed with the quotation. We quote FOB Laem Chabang, Map Ta Phut or Sattahip, or CIF and DAP to your Australian port, with packing lists, weights, lifting points and a data book per shipment. Staged deliveries can follow your site erection sequence instead of shipping everything at once.

There is no fixed minimum. Pipe spooling Australia packages run at up to 3,000 diameter inches per shift on SCH.40, from a single replacement spool to a full plant piping scope, with spools numbered, X rayed where specified and coated to match erection order. Mining equipment fabrication covers chutes, hoppers, ore bins, transfer towers and conveyor structures with Bisalloy, Hardox, rubber lining or hardfacing fitted in house, from one wear liner set to modules of up to 2,500 tonnes assembled at Sattahip. Send the scope list and we will tell you what the smallest sensible batch is for your programme.