Manufacturing & Technology
Australian Manufacturing Gets Big Boost
The economic outlook for manufacturing might be looking up after two key indicator reports suggested that the Australian economy has turned a corner.

The economic outlook for manufacturing might be looking up after two key indicator reports suggested that the Australian economy has turned a corner. It appears that the positive outlook for Australian manufacturing is close to being realized. Westpac’s consumer confidence sentiments insights suggested that Aussies are increasingly looking to spend, with a 5.3% rise in confidence in November, news that was compounded by NAB’s business confidence equivalent, which also saw a rise. Though the commercial outlook was not quite as strong as the consumer version, both were marked improvements on previous months and backed up a wider feeling that Australia’s period in the economic doldrums might be coming to an end. Manufacturing and mining plant and equipment Australia specifically continue to lag the wider economy, with forward orders a particular pain point, but even within that, the prospects were still improved on what they have been in recent months, suggesting a positive momentum.

Creditorwatch analysed the data for Industry Update, with Chief Economist Ivan Colhoun suggesting that, while not completely out of the woods, there were reasons to think that the long term lag might be about to come to an end. “It’s probably getting close for Australian manufacturing,” he said. “Lower interest rates would help house construction further, though that does not look likely until the first half of next year. “Negative forward orders mean more heavy steel fabrication companies are reporting a drop in orders than are reporting an increase. A smaller negative means that there are still more firms reporting deteriorating orders than improving orders, so it is still not great. But it may be suggesting we are getting close to the low point for the manufacturing cycle. I suspect the beginnings of an improvement in building approvals is helpful as the house construction sector is important for many Australian manufacturing processes.”
Notably, manufacturing was singled out as an area where the performance of the sector in Australia was likely to be most heavily impacted by global conditions rather than more localised issues. The jobs data, according to Colhoun, was even more difficult to parse. “I think the problem is very similar across the globe, due to the common shocks being experienced,” he said. “High interest rates and some pull forward of spending on manufactured goods during COVID. Improved postpandemic supply chains are likely to also be allowing more import competition. This is well reported to be affecting the steel sector. I do not have a good explanation for the plunge in unemployment expectations, it does look somewhat unusual and runs contrary to the trend in job advertisements which fell again in October after several broadly steady months.”
“At face value, it says consumers are more optimistic about their job prospects. It is not clear why they think that. Are they feeling generally more positive about the economy because of income tax cuts? Probably. This might mean they extrapolate this to a better job market. As before, there is not a confirming signal yet from job advertisements. Regarding manufacturing’s staffing troubles, traditional blue collar occupations, along with healthcare and social assistance, continue to report staffing issues, while traditional white collar professions have less problems sourcing staff. However, the outlook is optimistic with news like ARB’s expansion creating manufacturing jobs. As job ads slowly drop, this should loosen up the labour market with some benefit to manufacturing, however, the government’s tightening of immigration and student numbers will tend to work in the other direction, unfortunately.”
K999 Thailand carries out work of this kind through its steel fabrication capability team in Rayong.
Further reading
Follow gigafactory projects in the US across the wider market on Project Atlas Intel.
How K999 can help
How we apply the technology
Faster quoting, cleaner detailing and fewer site surprises come from the tools we use before the first cut, and the articles here explain how those tools change the work.
3D modelling and detailing- 01
3D modelling and shop detailing that resolves clashes before fabrication starts.
- 02
Fibre laser cutting for plate profiles, with nesting planned around the rolling schedule.
- 03
Project management that reports progress against the same model the client approved.
More on Manufacturing & Technology
All articlesRequest for quotation
Need fabricated steel to that standard?
Every enquiry is answered within 48 hours by our estimating team in Rayong. The priced quotation follows once drawings, quantities and standards are confirmed. Stainless steel fabrication, structural steel fabrication, pipe spooling, pressure vessels, steel tanks, mining equipment and conveyors, pig launchers, chutes and hoppers, send the package and we will price it.
Before you request a quotation
Steel fabrication quotation questions
What structural steel fabrication, pressure vessel and pipe spooling packages cost, what to send with an enquiry, and how delivery to site works.
Structural steel fabrication is priced from the section and plate tonnage, the detailing and drawing hours, welding and fitting manhours, NDT requirements, blast and coating system, packing and freight. Grade matters as much as weight: AS/NZS, ASTM, JIS and BS sections carry different mill prices, and heavy built up members take longer than rolled sections. Our Rayong workshop produces around 10,000 tonnes of structural steel fabrication a year, so a clear bill of materials is usually enough to price. Send the drawings and we answer within 48 hours; the priced quotation follows once quantities, standards and delivery dates are confirmed.
For steel fabrication work, send the drawings or IFC package, a bill of materials with material grades, the welding and NDT requirements, the coating specification, the delivery port and your site dates. Add the inspection and test plan, any third party inspection requirement, and whether trial assembly or match marking is needed. Where drawings are still in progress, a scope list with sizes, quantities and duty is enough to start, and the estimate is refined once the final package arrives. Every enquiry is answered within 48 hours, and the priced quotation is issued after scope, standards and quantities are confirmed.
Yes. Pressure vessel fabrication is carried out to ASME Section VIII Div. 1 under our ASME U stamp No. 43,462, or to AS/NZS and BS where the project specifies, covering separators, air receivers, water drums, waste heat recovery units and pig launchers. Steel tanks for fuel, biofuel, chemical, water and food duty are designed in house with our E Tank programme to API, ASME, BS and AS/NZS. Because structural steel, vessels, tanks and their supports are built in the same workshops, one enquiry can cover the vessel package, the tank package and the structural steel that carries them, with a single coating and documentation system and one shipment.
Steel fabrication Australia packages are scheduled from a 33,000 m2 Rayong yard with an 80,000 m2 assembly yard inside Sattahip port, so fabrication, trial assembly, blasting, coating and packing run in one place. Programme length depends on tonnage, material lead times, the coating system and inspection scope, and it is confirmed with the quotation. We quote FOB Laem Chabang, Map Ta Phut or Sattahip, or CIF and DAP to your Australian port, with packing lists, weights, lifting points and a data book per shipment. Staged deliveries can follow your site erection sequence instead of shipping everything at once.
There is no fixed minimum. Pipe spooling Australia packages run at up to 3,000 diameter inches per shift on SCH.40, from a single replacement spool to a full plant piping scope, with spools numbered, X rayed where specified and coated to match erection order. Mining equipment fabrication covers chutes, hoppers, ore bins, transfer towers and conveyor structures with Bisalloy, Hardox, rubber lining or hardfacing fitted in house, from one wear liner set to modules of up to 2,500 tonnes assembled at Sattahip. Send the scope list and we will tell you what the smallest sensible batch is for your programme.




