All articles

Manufacturing & Technology

Boost for Western Sydney Manufacturing

Western Sydney’s manufacturing industry is already one of the strongest in Australia - and it received a major boost last week with the completion of the first project out the new...

28 Dec 20242 min read
Boost for Western Sydney Manufacturing

Western Sydney’s manufacturing industry is already one of the strongest in Australia - and it received a major boost last week with the completion of the first project out the new Advanced Manufacturing Readiness Facility (AMRF) in Bradfield. The new innovation hub, which is funded by the NSW Government, completed a job with Emu Plains based cooling tower experts Marley Flow, who came to the AMRF to streamline manufacturing processes (e.g., pipe fabrication Australia) within their business. They managed to improve operational efficiency and, as a result, may now be able to gain six times the productivity of the business and an estimated 15 to 20% reduction in costs. The project was such a success that Marley Flow are set to go around again, this time with the goal of developing and designing new products for market.

Boost for Western Sydney Manufacturing
K999 workshop, Rayong

According to the government, the AMRF is a cornerstone of Bradfield City Centre’s economic strategy, aiming to create high value jobs and leverage the $20 billion worth of government infrastructure invested in the Aerotropolis. The facility will focus on cutting edge manufacturing support, from engineering design to heat induction bending services, connecting businesses with expertise, advanced technology, and networks to scale their operations. Sustainability has been embedded into the First Building’s design. Featuring natural materials, a green roof with biodiverse native plantings, and internal rammed earth walls, the building sets a benchmark for sustainable urban development. Its design, codeveloped by Hassell Studio and Dr. Danièle Hromek from Djinjama, incorporates principles of connecting and designing with Country.

“Marley Flow Control is excited to collaborate with the Advanced Manufacturing Readiness Facility (AMRF) on the first project,” said CEO Gareth Jones. “Working with the AMRF, tapping into their engineering expertise and expert knowledge to improve our manufacturing processes and ways of working, will enable us to increase productivity and reduce costs. Simple changes could make a massive difference to our operations. We see this as the beginning of a long partnership with the AMRF to help develop our product offering. Along with TAFE Manufacturing Centre of Excellence, we’reproud to be one of the first to access this world class manufacturing development centre right here in Western Sydney.”

It was a superb start for what should be an enduring addition to manufacturing in Sydney’s West. “The AMRF is a NSW Government strategy to accelerate innovation and grow businesses in Western Sydney and we’redelighted to announce the completion of our first project,” said Bradfield Development Authority CEO, Ken Morrison. “Western Sydney is home to one of the largest concentrations of manufacturing businesses in Australia and the AMRF is a resource to support them innovate, grow and provide more jobs. With the AMRF, it is an exciting opportunity to leverage the benefits of homegrown manufacturers and to transition to new ways of doing business or create high value components for the next generation of advanced technologies.”

K999 Thailand carries out work of this kind through its steel fabrication capability team in Rayong.

Further reading

Follow Hydrogen across the wider market on Project Atlas Intel.

Share this article LinkedIn X Facebook

How K999 can help

How we apply the technology

Faster quoting, cleaner detailing and fewer site surprises come from the tools we use before the first cut, and the articles here explain how those tools change the work.

3D modelling and detailing
  • 01

    3D modelling and shop detailing that resolves clashes before fabrication starts.

  • 02

    Fibre laser cutting for plate profiles, with nesting planned around the rolling schedule.

  • 03

    Project management that reports progress against the same model the client approved.

Request for quotation

Need fabricated steel to that standard?

Every enquiry is answered within 48 hours by our estimating team in Rayong. The priced quotation follows once drawings, quantities and standards are confirmed. Stainless steel fabrication, structural steel fabrication, pipe spooling, pressure vessels, steel tanks, mining equipment and conveyors, pig launchers, chutes and hoppers, send the package and we will price it.

Before you request a quotation

Steel fabrication quotation questions

What structural steel fabrication, pressure vessel and pipe spooling packages cost, what to send with an enquiry, and how delivery to site works.

Structural steel fabrication is priced from the section and plate tonnage, the detailing and drawing hours, welding and fitting manhours, NDT requirements, blast and coating system, packing and freight. Grade matters as much as weight: AS/NZS, ASTM, JIS and BS sections carry different mill prices, and heavy built up members take longer than rolled sections. Our Rayong workshop produces around 10,000 tonnes of structural steel fabrication a year, so a clear bill of materials is usually enough to price. Send the drawings and we answer within 48 hours; the priced quotation follows once quantities, standards and delivery dates are confirmed.

For steel fabrication work, send the drawings or IFC package, a bill of materials with material grades, the welding and NDT requirements, the coating specification, the delivery port and your site dates. Add the inspection and test plan, any third party inspection requirement, and whether trial assembly or match marking is needed. Where drawings are still in progress, a scope list with sizes, quantities and duty is enough to start, and the estimate is refined once the final package arrives. Every enquiry is answered within 48 hours, and the priced quotation is issued after scope, standards and quantities are confirmed.

Yes. Pressure vessel fabrication is carried out to ASME Section VIII Div. 1 under our ASME U stamp No. 43,462, or to AS/NZS and BS where the project specifies, covering separators, air receivers, water drums, waste heat recovery units and pig launchers. Steel tanks for fuel, biofuel, chemical, water and food duty are designed in house with our E Tank programme to API, ASME, BS and AS/NZS. Because structural steel, vessels, tanks and their supports are built in the same workshops, one enquiry can cover the vessel package, the tank package and the structural steel that carries them, with a single coating and documentation system and one shipment.

Steel fabrication Australia packages are scheduled from a 33,000 m2 Rayong yard with an 80,000 m2 assembly yard inside Sattahip port, so fabrication, trial assembly, blasting, coating and packing run in one place. Programme length depends on tonnage, material lead times, the coating system and inspection scope, and it is confirmed with the quotation. We quote FOB Laem Chabang, Map Ta Phut or Sattahip, or CIF and DAP to your Australian port, with packing lists, weights, lifting points and a data book per shipment. Staged deliveries can follow your site erection sequence instead of shipping everything at once.

There is no fixed minimum. Pipe spooling Australia packages run at up to 3,000 diameter inches per shift on SCH.40, from a single replacement spool to a full plant piping scope, with spools numbered, X rayed where specified and coated to match erection order. Mining equipment fabrication covers chutes, hoppers, ore bins, transfer towers and conveyor structures with Bisalloy, Hardox, rubber lining or hardfacing fitted in house, from one wear liner set to modules of up to 2,500 tonnes assembled at Sattahip. Send the scope list and we will tell you what the smallest sensible batch is for your programme.