All articles

Mining & Resources

Cobalt Holdings Set for London’s Biggest Mining IPO Since 2022: A $230M Industry Shake Up

The London Stock Exchange is poised for a major mining market revival in 2025, as Cobalt Holdings prepares to launch what may be the largest mining IPO since 2022.

20 May 20252 min read
Cobalt Holdings Set for London’s Biggest Mining IPO Since 2022: A $230M Industry Shake Up

Biggest Mining IPO Since 2022

The London Stock Exchange is poised for a major mining market revival in 2025, as Cobalt Holdings prepares to launch what may be the largest mining IPO since 2022. With a funding target of $230 million (£174 million), this listing signals a renewed investor appetite for critical minerals, especially cobalt, a key ingredient in electric vehicle (EV) batteries and renewable energy technologies.

A Strategic Bet on Cobalt’s Future

Cobalt Holdings isn’t your typical mining company. It doesn’t mine cobalt, it buys, stores, and trades it. The company plans to use IPO proceeds to purchase 6,000 tonnes of physical cobalt from commodities giant Glencore under a six year supply agreement.

This positions Cobalt Holdings as a low cost, physical holding vehicle for investors seeking direct exposure to cobalt prices, rather than the operational risks of mining.

Backed by Industry Giants

The IPO has drawn heavyweight backing:

Glencore will supply the cobalt and take a 10% stake in Cobalt Holdings.

Anchorage Capital, a U.S. investment firm, is also on board, bringing the combined insider ownership to 20.5%.

Cobalt Holdings Set for London’s Biggest Mining IPO Since 2022: A $230M Industry Shake Up
K999 workshop, Rayong

These partnerships offer both supply security and strong financial backing, critical factors in a volatile commodities market.

Global Market Timing

The launch couldn’t be more timely:

The Democratic Republic of Congo, which supplies over 75% of the world’s cobalt, recently imposed a four month export moratorium, causing short term supply concerns.

Although cobalt prices have slumped since their 2022 highs, long term demand remains strong due to growing needs in EVs, smartphones, and grid storage systems.

Cobalt Holdings is positioning itself as a strategic storage and trading platform ready to benefit from any price rebound.

‍ A Seasoned Leadership Team

CEO Jake Greenberg, cofounder of uranium investment company Yellow Cake PLC, brings experience in managing commodities as investable assets rather than operating mines. His model emphasizes transparency, low costs, and physical backing, an approach that’s proven popular with institutional investors.

What This Means for Investors

If successful, Cobalt Holdings will become a new kind of commodity player, more like a cobalt ETF than a traditional mining firm. It gives shareholders direct cobalt exposure without operational or geopolitical risk from mining jurisdictions.

With growing focus on securing critical minerals for the energy transition, this IPO could pave the way for more listings centered on strategic resource investment rather than extraction.

Final Thoughts

The $230 million IPO by Cobalt Holdings is more than a financial event, it’s a signal of where the industry is headed. As clean energy and battery demand surge, innovative models like this will shape the future of resource investment. If you’retracking the evolution of the mining sector or the critical minerals supply chain, this is one IPO to watch.

K999 Thailand carries out work of this kind through its mining equipment fabrication team in Rayong.

Further reading

Follow public procurement tenders in Europe across the wider market on Project Atlas Intel.

Share this article LinkedIn X Facebook

How K999 can help

Equipment built for the pit

Mining work is where wear life decides the maintenance budget, so the articles in this section feed directly into how we detail chutes, hoppers, conveyors and wear parts.

Mining equipment and conveyors
  • 01

    Mining equipment and conveyor fabrication with replaceable wear liners and hardfaced contact surfaces.

  • 02

    Chutes, hoppers and transfer structures detailed for access, lifting and shutdown windows.

  • 03

    Site assembly planning from the Sattahip yard for modules that ship by sea.

Request for quotation

Need fabricated steel to that standard?

Every enquiry is answered within 48 hours by our estimating team in Rayong. The priced quotation follows once drawings, quantities and standards are confirmed. Stainless steel fabrication, structural steel fabrication, pipe spooling, pressure vessels, steel tanks, mining equipment and conveyors, pig launchers, chutes and hoppers, send the package and we will price it.

Before you request a quotation

Steel fabrication quotation questions

What structural steel fabrication, pressure vessel and pipe spooling packages cost, what to send with an enquiry, and how delivery to site works.

Structural steel fabrication is priced from the section and plate tonnage, the detailing and drawing hours, welding and fitting manhours, NDT requirements, blast and coating system, packing and freight. Grade matters as much as weight: AS/NZS, ASTM, JIS and BS sections carry different mill prices, and heavy built up members take longer than rolled sections. Our Rayong workshop produces around 10,000 tonnes of structural steel fabrication a year, so a clear bill of materials is usually enough to price. Send the drawings and we answer within 48 hours; the priced quotation follows once quantities, standards and delivery dates are confirmed.

For steel fabrication work, send the drawings or IFC package, a bill of materials with material grades, the welding and NDT requirements, the coating specification, the delivery port and your site dates. Add the inspection and test plan, any third party inspection requirement, and whether trial assembly or match marking is needed. Where drawings are still in progress, a scope list with sizes, quantities and duty is enough to start, and the estimate is refined once the final package arrives. Every enquiry is answered within 48 hours, and the priced quotation is issued after scope, standards and quantities are confirmed.

Yes. Pressure vessel fabrication is carried out to ASME Section VIII Div. 1 under our ASME U stamp No. 43,462, or to AS/NZS and BS where the project specifies, covering separators, air receivers, water drums, waste heat recovery units and pig launchers. Steel tanks for fuel, biofuel, chemical, water and food duty are designed in house with our E Tank programme to API, ASME, BS and AS/NZS. Because structural steel, vessels, tanks and their supports are built in the same workshops, one enquiry can cover the vessel package, the tank package and the structural steel that carries them, with a single coating and documentation system and one shipment.

Steel fabrication Australia packages are scheduled from a 33,000 m2 Rayong yard with an 80,000 m2 assembly yard inside Sattahip port, so fabrication, trial assembly, blasting, coating and packing run in one place. Programme length depends on tonnage, material lead times, the coating system and inspection scope, and it is confirmed with the quotation. We quote FOB Laem Chabang, Map Ta Phut or Sattahip, or CIF and DAP to your Australian port, with packing lists, weights, lifting points and a data book per shipment. Staged deliveries can follow your site erection sequence instead of shipping everything at once.

There is no fixed minimum. Pipe spooling Australia packages run at up to 3,000 diameter inches per shift on SCH.40, from a single replacement spool to a full plant piping scope, with spools numbered, X rayed where specified and coated to match erection order. Mining equipment fabrication covers chutes, hoppers, ore bins, transfer towers and conveyor structures with Bisalloy, Hardox, rubber lining or hardfacing fitted in house, from one wear liner set to modules of up to 2,500 tonnes assembled at Sattahip. Send the scope list and we will tell you what the smallest sensible batch is for your programme.