Fabrication
Cost Effective Automation of Tube Bending
Servo tube benders with stored recipes make short runs repeatable, reducing scrap on multibend pipe and tube work.

There is a general perception that investment in automation is financially viable only for large manufacturing firms due to the high investment in technology, quality control, training etc. However, smaller production units can also benefit by the implementation of partial or full automation which leads to savings of time and money. If, for example, a robot loads and unloads a shop’s CNC bending machines, human specialists can focus on more demanding tasks, such as quality control and machine programming. So, what are the factors and considerations for automation in tube bending operations to be cost effective? We will explore this topic further in this blog.
Correct Feeder Selection
Various factors play a decisive role in metal bending processes. These must be precisely analyzed and accounted for beforehand. Simple bending geometries can be fed into the process via loading tables, step feeders, or conveyor belts. In this case, the length and tube dimensions determine appropriate choice of feeder. For instance, long tubes with a small diameter are not suitable for a chain feeder because of their unstable nature. Here, a loading table or a step feeder would be better choices. The cycle times in the bending process also must be taken into account. If the bending geometry is complicated or has multiple bends, there is no need for a feeder designed for speed. In this scenario, a system with a large loading volume may be the better choice.

In most cases, the workpieces must be separated before loading. Chain feeders are often the best choice here because tubes being fed into the bending process can be placed in the desired starting position, they do not have to be aligned for the bending process. Also, it is now possible to use sensors in a cost effective way with simple loading systems. This also applies to scanning applied QR codes to call up bending programs during the production process. This makes it possible to change the bending geometry for tubes of the same diameter during the process. In this way, even small series or individual pieces can be produced without interruptions.
Leveraging of Robotics
At times, a robot is simply the best choice for improving fabrication efficiency by automation. For instance, when tubes are loaded into a right/left bending machine, they often have to go through further processing stages before or after the actual bending process. CNC right/left bending machines with mandrels can rotate the bending head 180 degrees, thus offering the possibility of depositing bent tubes on a conveyor belt in a controlled manner. There are also options for bending machines that cannot rotate the bending head. Tubes can be discharged after the bending process via simple slides and baffle plates onto conveyor belts or directly into collection containers. In cases like these, in which many complex geometries are being processed, robots handle the jobs with the most ease. If a production cell is not an option, a robot that can perform loading and unloading in addition to the handling is usually the best choice. However, a robot always needs some space to make full use of its benefits. As space restrictions often play a decisive role and short distances achieve better cycle times, shops should consider a compact design to make efficient use of machine paths.
Final Synopsis
The above analysis provides a clear picture that a small, self sufficient cell comprising a bending machine with simple overhead handling, in combination with a chain feeder and a conveyor belt for unloading, can be an extremely economical system, even in the smallest of spaces. It should be noted that automation always needs to be tailored to accommodate a steel fabrication shop’s specific environment, needs, and material flow to be truly successfully and efficient. In summary, automation can be a viable choice for every size shop to combat today’s challenges such as labour shortages, quality improvement, and production efficiency.
Further reading
Follow hydrogen projects in Europe across the wider market on Project Atlas Intel.
Calculation tool
Run the numbers for this yourself with the free engineering knowledge centre from Engineering Toolbox Australia. Treat the result as a first check, then confirm the final design with your engineer.
How K999 can help
Fabrication capacity behind the article
Articles in this section describe work we run every week in Rayong: cutting, forming, welding and assembly, under cover and in the yard, with the documentation that goes with it.
Structural steel fabrication- 01
Two workshops totalling more than 33,000 m² plus an 80,000 m² assembly yard at Sattahip.
- 02
Structural steel fabrication to 10,000 tonnes a year, with the largest single module built at 2,500 tonnes.
- 03
Blast, prime and paint before dispatch, with dimensional reports issued against the approved drawings.
More on Fabrication
All articlesRequest for quotation
Need fabricated steel to that standard?
Every enquiry is answered within 48 hours by our estimating team in Rayong. The priced quotation follows once drawings, quantities and standards are confirmed. Stainless steel fabrication, structural steel fabrication, pipe spooling, pressure vessels, steel tanks, mining equipment and conveyors, pig launchers, chutes and hoppers, send the package and we will price it.
Before you request a quotation
Steel fabrication quotation questions
What structural steel fabrication, pressure vessel and pipe spooling packages cost, what to send with an enquiry, and how delivery to site works.
Structural steel fabrication is priced from the section and plate tonnage, the detailing and drawing hours, welding and fitting manhours, NDT requirements, blast and coating system, packing and freight. Grade matters as much as weight: AS/NZS, ASTM, JIS and BS sections carry different mill prices, and heavy built up members take longer than rolled sections. Our Rayong workshop produces around 10,000 tonnes of structural steel fabrication a year, so a clear bill of materials is usually enough to price. Send the drawings and we answer within 48 hours; the priced quotation follows once quantities, standards and delivery dates are confirmed.
For steel fabrication work, send the drawings or IFC package, a bill of materials with material grades, the welding and NDT requirements, the coating specification, the delivery port and your site dates. Add the inspection and test plan, any third party inspection requirement, and whether trial assembly or match marking is needed. Where drawings are still in progress, a scope list with sizes, quantities and duty is enough to start, and the estimate is refined once the final package arrives. Every enquiry is answered within 48 hours, and the priced quotation is issued after scope, standards and quantities are confirmed.
Yes. Pressure vessel fabrication is carried out to ASME Section VIII Div. 1 under our ASME U stamp No. 43,462, or to AS/NZS and BS where the project specifies, covering separators, air receivers, water drums, waste heat recovery units and pig launchers. Steel tanks for fuel, biofuel, chemical, water and food duty are designed in house with our E Tank programme to API, ASME, BS and AS/NZS. Because structural steel, vessels, tanks and their supports are built in the same workshops, one enquiry can cover the vessel package, the tank package and the structural steel that carries them, with a single coating and documentation system and one shipment.
Steel fabrication Australia packages are scheduled from a 33,000 m2 Rayong yard with an 80,000 m2 assembly yard inside Sattahip port, so fabrication, trial assembly, blasting, coating and packing run in one place. Programme length depends on tonnage, material lead times, the coating system and inspection scope, and it is confirmed with the quotation. We quote FOB Laem Chabang, Map Ta Phut or Sattahip, or CIF and DAP to your Australian port, with packing lists, weights, lifting points and a data book per shipment. Staged deliveries can follow your site erection sequence instead of shipping everything at once.
There is no fixed minimum. Pipe spooling Australia packages run at up to 3,000 diameter inches per shift on SCH.40, from a single replacement spool to a full plant piping scope, with spools numbered, X rayed where specified and coated to match erection order. Mining equipment fabrication covers chutes, hoppers, ore bins, transfer towers and conveyor structures with Bisalloy, Hardox, rubber lining or hardfacing fitted in house, from one wear liner set to modules of up to 2,500 tonnes assembled at Sattahip. Send the scope list and we will tell you what the smallest sensible batch is for your programme.