Data Woes Stifling Manufacturing

Inconsistent job numbering and paper records block the reporting that manufacturing managers need to act on.

7 May 20243 min read
Data Woes Stifling Manufacturing

Manufacturing depends a lot on data. Data is one of the top manufacturing technology trends and is the basis for day to day work as well as strategic initiatives. New research by Forrester Consulting for Hexagon Manufacturing Intelligence shows that almost all manufacturers are struggling with data issues, impacting their ability to roll out advanced technologies. This leaves them at risk of being left behind their rivals, the report reveals. So, what are these data issues and do they impact the cybersecurity of manufacturing firms? Let us find out in this blog.

Findings on Data Issues

Some data points around specific findings include the following:

98% of manufacturers report at least one issue with data within their organization. Leaders are considering real time collaboration, AI, and automation, but persistent data challenges stifle innovation and impede the roll out of such advanced manufacturing technologies.

These data woes contributed to 97% of manufacturers facing challenges in collaboration and productivity, which can impact their ability to innovate and delay responding to customers’ needs.

The majority of business leaders realize that better collaboration can improve product quality (88%), time to market (86%) and sustainability, with 82% of respondents believing better communication between design and manufacturing teams can significantly reduce material waste and emissions.

Data Woes Stifling Manufacturing
K999 workshop, Rayong

Despite this, almost three quarters (71%) are concerned about the lack of synergy between their design and manufacturing teams.

Only 2% of manufacturers claimed to be problem free with their data practices.

37% of manufacturers are falling behind their rivals and should be considered ‘laggards’, as they have failed to automate any phase of their manufacturing process partially or fully. This is compared to a quarter of manufacturers that should be considered the ‘leaders’ in the market, as they have highly or fully decentralized automation incorporated into at least two phases of their manufacturing processes.

Additionally, 58% of leaders report increased staff productivity and innovation, versus 35% of laggards.

What About Cybersecurity?

While the report did not go into detail about the cyber status of manufacturing, it is not difficult to connect the dots. Manufacturing organizations that struggle with implementing new technologies, along with accessing and sharing the data being generated by current software and automated processes, would seem to also have issues with protecting any OT assets. While some might point to a lack of technology and data management platforms as limiting the attack surface and potentially making their enterprise less palatable to hackers, this mindset has been proven wrong numerous times throughout the steel fabrication sector. The reality is that to improve operational efficiency and stay competitive, investments in the areas addressed by Hexagon’s research are essential. But just as essential is working hand in hand with IT and OT teams to ensure all these platforms are being integrated with cybersecurity in mind. Accompanying these priorities should be well defined and thorough plans and strategies for managing, monitoring, and updating these OT assets with the proper cybersecurity protocols. Essentially, this report not only identifies the numerous missed opportunities from a technological investment perspective (such as incorporating sampling processes in manufacturing), but as a reminder of the role cybersecurity needs to play when developing plans for introducing these new tools into the manufacturing organization.

Closing Remarks

It can thus be observed that there are a multitude of data challenges facing the industrial sector today, and it may impact cybersecurity as well. As the importance of data grows, manufacturing firms have an increased responsibility to ensure clean, consistent, and up to date data in legacy systems and this will help to improve the performance of manufacturing firms overall. There is a saying that “Data is King”, and it is totally relevant in this scenario!

K999 Thailand carries out work of this kind through its steel fabrication capability team in Rayong.

Further reading

Follow procurement intelligence across the wider market on Project Atlas Intel.

Calculation tool

Run the numbers for this yourself with the free steel section properties from Engineering Toolbox Australia. Treat the result as a first check, then confirm the final design with your engineer.

Share this article LinkedIn X Facebook

How K999 can help

How we apply the technology

Faster quoting, cleaner detailing and fewer site surprises come from the tools we use before the first cut, and the articles here explain how those tools change the work.

3D modelling and detailing
  • 01

    3D modelling and shop detailing that resolves clashes before fabrication starts.

  • 02

    Fibre laser cutting for plate profiles, with nesting planned around the rolling schedule.

  • 03

    Project management that reports progress against the same model the client approved.

Request for quotation

Need fabricated steel to that standard?

Every enquiry is answered within 48 hours by our estimating team in Rayong. The priced quotation follows once drawings, quantities and standards are confirmed. Stainless steel fabrication, structural steel fabrication, pipe spooling, pressure vessels, steel tanks, mining equipment and conveyors, pig launchers, chutes and hoppers, send the package and we will price it.

Before you request a quotation

Steel fabrication quotation questions

What structural steel fabrication, pressure vessel and pipe spooling packages cost, what to send with an enquiry, and how delivery to site works.

Structural steel fabrication is priced from the section and plate tonnage, the detailing and drawing hours, welding and fitting manhours, NDT requirements, blast and coating system, packing and freight. Grade matters as much as weight: AS/NZS, ASTM, JIS and BS sections carry different mill prices, and heavy built up members take longer than rolled sections. Our Rayong workshop produces around 10,000 tonnes of structural steel fabrication a year, so a clear bill of materials is usually enough to price. Send the drawings and we answer within 48 hours; the priced quotation follows once quantities, standards and delivery dates are confirmed.

For steel fabrication work, send the drawings or IFC package, a bill of materials with material grades, the welding and NDT requirements, the coating specification, the delivery port and your site dates. Add the inspection and test plan, any third party inspection requirement, and whether trial assembly or match marking is needed. Where drawings are still in progress, a scope list with sizes, quantities and duty is enough to start, and the estimate is refined once the final package arrives. Every enquiry is answered within 48 hours, and the priced quotation is issued after scope, standards and quantities are confirmed.

Yes. Pressure vessel fabrication is carried out to ASME Section VIII Div. 1 under our ASME U stamp No. 43,462, or to AS/NZS and BS where the project specifies, covering separators, air receivers, water drums, waste heat recovery units and pig launchers. Steel tanks for fuel, biofuel, chemical, water and food duty are designed in house with our E Tank programme to API, ASME, BS and AS/NZS. Because structural steel, vessels, tanks and their supports are built in the same workshops, one enquiry can cover the vessel package, the tank package and the structural steel that carries them, with a single coating and documentation system and one shipment.

Steel fabrication Australia packages are scheduled from a 33,000 m2 Rayong yard with an 80,000 m2 assembly yard inside Sattahip port, so fabrication, trial assembly, blasting, coating and packing run in one place. Programme length depends on tonnage, material lead times, the coating system and inspection scope, and it is confirmed with the quotation. We quote FOB Laem Chabang, Map Ta Phut or Sattahip, or CIF and DAP to your Australian port, with packing lists, weights, lifting points and a data book per shipment. Staged deliveries can follow your site erection sequence instead of shipping everything at once.

There is no fixed minimum. Pipe spooling Australia packages run at up to 3,000 diameter inches per shift on SCH.40, from a single replacement spool to a full plant piping scope, with spools numbered, X rayed where specified and coated to match erection order. Mining equipment fabrication covers chutes, hoppers, ore bins, transfer towers and conveyor structures with Bisalloy, Hardox, rubber lining or hardfacing fitted in house, from one wear liner set to modules of up to 2,500 tonnes assembled at Sattahip. Send the scope list and we will tell you what the smallest sensible batch is for your programme.