Mining & Resources
Development Progresses on NT Mining Project
In August, Projectory reported that a Northern Territory rare earth mining project is inching ahead thanks to a NT Government grant, now the latest update is that the drilling campaign...

In August, Projectory reported that a Northern Territory rare earth mining project is inching ahead thanks to a NT Government grant, now the latest update is that the drilling campaign is commencing. MetalsGrove Mining is currently undertaking a phase two soil sampling program at the Arunta Project’s Bruce Prospect in the Northern Territory. This follows the recent discovery of high grade rare earth element mineralisation. Aeromagnetic and surface geochemistry work identified a 1,000 metre by 600 metre intrusive system considered as highly prospective for rare earth mineralisation.

The testing is the early part of a 2,000 metre drilling campaign, which will soon commence with appropriate mining plant and equipment to test the property’s best looking targets and will involve a broad conductor and a substantial intrusive system measuring 1,600 metres by 600 metres. MetalsGrove’s program director Sean Sivasamy has been contacted for comment and said in a statement that the company is fast tracking its exploration in the region. “Both the sampling and drilling programs completed so far have been extremely encouraging and point to a potential high grade REE mineralised system within our tenure,” he said.
“This next phase of sampling will look to build on the recent drilling success and further refine our next suite of drill targets, as we move quickly to assess and unlock the potential of our prospects within the Arunta region.” The phase 2 soil sampling program will leverage steel fabrication in mining by testing remaining outcrops and geophysical anomalies along the 9 kilometre carbonatite corridor. All things going to plan, the company aims to commence the next phase of drilling using advanced drilling technologies at the end of the third quarter. The Bruce REE Prospect covers an area of about 17,722 hectares and is located within the central desert region of the Northern Territory.
Source: https://www.projectory.com.au/article/development progresses on nt rare earth project
K999 Thailand carries out work of this kind through its mining equipment fabrication team in Rayong.
Further reading
Follow critical minerals projects in the United States across the wider market on Project Atlas Intel.
How K999 can help
Equipment built for the pit
Mining work is where wear life decides the maintenance budget, so the articles in this section feed directly into how we detail chutes, hoppers, conveyors and wear parts.
Mining equipment and conveyors- 01
Mining equipment and conveyor fabrication with replaceable wear liners and hardfaced contact surfaces.
- 02
Chutes, hoppers and transfer structures detailed for access, lifting and shutdown windows.
- 03
Site assembly planning from the Sattahip yard for modules that ship by sea.
More on Mining & Resources
All articlesRequest for quotation
Need fabricated steel to that standard?
Every enquiry is answered within 48 hours by our estimating team in Rayong. The priced quotation follows once drawings, quantities and standards are confirmed. Stainless steel fabrication, structural steel fabrication, pipe spooling, pressure vessels, steel tanks, mining equipment and conveyors, pig launchers, chutes and hoppers, send the package and we will price it.
Before you request a quotation
Steel fabrication quotation questions
What structural steel fabrication, pressure vessel and pipe spooling packages cost, what to send with an enquiry, and how delivery to site works.
Structural steel fabrication is priced from the section and plate tonnage, the detailing and drawing hours, welding and fitting manhours, NDT requirements, blast and coating system, packing and freight. Grade matters as much as weight: AS/NZS, ASTM, JIS and BS sections carry different mill prices, and heavy built up members take longer than rolled sections. Our Rayong workshop produces around 10,000 tonnes of structural steel fabrication a year, so a clear bill of materials is usually enough to price. Send the drawings and we answer within 48 hours; the priced quotation follows once quantities, standards and delivery dates are confirmed.
For steel fabrication work, send the drawings or IFC package, a bill of materials with material grades, the welding and NDT requirements, the coating specification, the delivery port and your site dates. Add the inspection and test plan, any third party inspection requirement, and whether trial assembly or match marking is needed. Where drawings are still in progress, a scope list with sizes, quantities and duty is enough to start, and the estimate is refined once the final package arrives. Every enquiry is answered within 48 hours, and the priced quotation is issued after scope, standards and quantities are confirmed.
Yes. Pressure vessel fabrication is carried out to ASME Section VIII Div. 1 under our ASME U stamp No. 43,462, or to AS/NZS and BS where the project specifies, covering separators, air receivers, water drums, waste heat recovery units and pig launchers. Steel tanks for fuel, biofuel, chemical, water and food duty are designed in house with our E Tank programme to API, ASME, BS and AS/NZS. Because structural steel, vessels, tanks and their supports are built in the same workshops, one enquiry can cover the vessel package, the tank package and the structural steel that carries them, with a single coating and documentation system and one shipment.
Steel fabrication Australia packages are scheduled from a 33,000 m2 Rayong yard with an 80,000 m2 assembly yard inside Sattahip port, so fabrication, trial assembly, blasting, coating and packing run in one place. Programme length depends on tonnage, material lead times, the coating system and inspection scope, and it is confirmed with the quotation. We quote FOB Laem Chabang, Map Ta Phut or Sattahip, or CIF and DAP to your Australian port, with packing lists, weights, lifting points and a data book per shipment. Staged deliveries can follow your site erection sequence instead of shipping everything at once.
There is no fixed minimum. Pipe spooling Australia packages run at up to 3,000 diameter inches per shift on SCH.40, from a single replacement spool to a full plant piping scope, with spools numbered, X rayed where specified and coated to match erection order. Mining equipment fabrication covers chutes, hoppers, ore bins, transfer towers and conveyor structures with Bisalloy, Hardox, rubber lining or hardfacing fitted in house, from one wear liner set to modules of up to 2,500 tonnes assembled at Sattahip. Send the scope list and we will tell you what the smallest sensible batch is for your programme.





