All articles

Fabrication

How to Create a Good Technical Drawing

Views, dimensions, tolerances and revision control that let a fabricator build the part right first time without raising queries.

2 Jul 20243 min read
How to Create a Good Technical Drawing

Two dimensional technical drawings have been part of the engineering process since before the printing press. According to Interesting Engineering, perspective drawing was invented in the 1300s. The first technical drawings for manufacturing were perspective drawings of real objects. Centuries later, the invention of descriptive geometry (1765) and orthographic projection (1770), helped engineers give visual form to their ideas. From this point until the introduction of 3D CAD modelling in the 1980s, 2D technical drawings were the main way engineers documented their designs. This blog will delve into the best practices involved when developing a technical drawing.

A Paradigm Shift to CAD Driven Manufacturing

Today, most projects are designed as 3D CAD files from the start. Heavy steel fabrication companies use digital tools to generate manufacturing commands for computer controlled machinery such as CNC machines or equipment for 3D metal printing. This planning software, such as CAM, uses the 3D model to create toolpaths and movements for the manufacturing process. The technical information captured on a drawing or print might only be used as a reference rather than a definitive guide for manufacturing, especially since some of the standard dimensions may not be included in the actual print drawing. Instead, it is assumed that the 3D CAD program would guide those feature sets, or dimensions, not shown on a drawing.

Technical Drawing Best Practices

Create a template, Create a single template that can be used for detail and assembly drawings compliant with ASME or ISO standards (depending on location). The title block in the bottom right corner must include company or organization information, names of the people responsible for the drawings (designer, checker, approver), drawing title/name, revision reference, sheet size, view alignment convention, and primary scale.

How to Create a Good Technical Drawing
K999 workshop, Rayong

Add coordinates and a notes list, When creating large or complex technical drawings for manufacturing, it is good practice to include coordinate divisions along the border as reference points when discussing a dimension or feature.

Check scale and units, Ensure that the drawings fit on the page and that the dimensions will be clearly seen in each view. If the part to be manufactured abroad, it is best practice to use the metric system for dimensions.

Ensure correct tolerances, Generally, it is best to choose reasonable tolerances for most modern CNC machines, typically around +/- 0.005” for distance dimensions. Tolerances narrower than the general range are considered “tight tolerances,” and those wider than the general range are “loose tolerances.”

Create templates for subsequent sheets, In preparation for revisions, create a template that has a continuation title block and a revision table in the top right corner which displays the revision date, the reason for the change, and the name of the person who made the revisions.

Ensure views align with the projection view, Once one starts drawing, it is important to use the correct projection alignment. The person fabricating the part will use this orientation during manufacturing, so make sure that all the views follow the alignment convention that is specified in the title block.

Include an isometric view, If there is room on the page, it is good practice to include a 3D isometric view to help the machinist when manufacturing the part via rapid prototyping. These do not need to be in the same alignment as the orthographic views but it is important to make sure that they are drawn from the correct corner for the orientation to be shown.

Closing Thoughts

Overall, clarity is the most important factor in any technical drawings for manufacturing and steel fabrication Australia. It is necessary to take the time to ensure that every detail is clear and the drawing complies with the accepted standards. Additionally, it is important to ensure that the drawing undergoes all quality assurance and approval procedures. A drawing that is easy to follow and clearly defines business requirements is one of the first steps to a successfully manufactured part!

Further reading

Follow Battery Materials across the wider market on Project Atlas Intel.

Calculation tool

Run the numbers for this yourself with the free steel take-off calculator from Engineering Toolbox Australia. Treat the result as a first check, then confirm the final design with your engineer.

Share this article LinkedIn X Facebook

How K999 can help

Fabrication capacity behind the article

Articles in this section describe work we run every week in Rayong: cutting, forming, welding and assembly, under cover and in the yard, with the documentation that goes with it.

Structural steel fabrication
  • 01

    Two workshops totalling more than 33,000 m² plus an 80,000 m² assembly yard at Sattahip.

  • 02

    Structural steel fabrication to 10,000 tonnes a year, with the largest single module built at 2,500 tonnes.

  • 03

    Blast, prime and paint before dispatch, with dimensional reports issued against the approved drawings.

Request for quotation

Need fabricated steel to that standard?

Every enquiry is answered within 48 hours by our estimating team in Rayong. The priced quotation follows once drawings, quantities and standards are confirmed. Stainless steel fabrication, structural steel fabrication, pipe spooling, pressure vessels, steel tanks, mining equipment and conveyors, pig launchers, chutes and hoppers, send the package and we will price it.

Before you request a quotation

Steel fabrication quotation questions

What structural steel fabrication, pressure vessel and pipe spooling packages cost, what to send with an enquiry, and how delivery to site works.

Structural steel fabrication is priced from the section and plate tonnage, the detailing and drawing hours, welding and fitting manhours, NDT requirements, blast and coating system, packing and freight. Grade matters as much as weight: AS/NZS, ASTM, JIS and BS sections carry different mill prices, and heavy built up members take longer than rolled sections. Our Rayong workshop produces around 10,000 tonnes of structural steel fabrication a year, so a clear bill of materials is usually enough to price. Send the drawings and we answer within 48 hours; the priced quotation follows once quantities, standards and delivery dates are confirmed.

For steel fabrication work, send the drawings or IFC package, a bill of materials with material grades, the welding and NDT requirements, the coating specification, the delivery port and your site dates. Add the inspection and test plan, any third party inspection requirement, and whether trial assembly or match marking is needed. Where drawings are still in progress, a scope list with sizes, quantities and duty is enough to start, and the estimate is refined once the final package arrives. Every enquiry is answered within 48 hours, and the priced quotation is issued after scope, standards and quantities are confirmed.

Yes. Pressure vessel fabrication is carried out to ASME Section VIII Div. 1 under our ASME U stamp No. 43,462, or to AS/NZS and BS where the project specifies, covering separators, air receivers, water drums, waste heat recovery units and pig launchers. Steel tanks for fuel, biofuel, chemical, water and food duty are designed in house with our E Tank programme to API, ASME, BS and AS/NZS. Because structural steel, vessels, tanks and their supports are built in the same workshops, one enquiry can cover the vessel package, the tank package and the structural steel that carries them, with a single coating and documentation system and one shipment.

Steel fabrication Australia packages are scheduled from a 33,000 m2 Rayong yard with an 80,000 m2 assembly yard inside Sattahip port, so fabrication, trial assembly, blasting, coating and packing run in one place. Programme length depends on tonnage, material lead times, the coating system and inspection scope, and it is confirmed with the quotation. We quote FOB Laem Chabang, Map Ta Phut or Sattahip, or CIF and DAP to your Australian port, with packing lists, weights, lifting points and a data book per shipment. Staged deliveries can follow your site erection sequence instead of shipping everything at once.

There is no fixed minimum. Pipe spooling Australia packages run at up to 3,000 diameter inches per shift on SCH.40, from a single replacement spool to a full plant piping scope, with spools numbered, X rayed where specified and coated to match erection order. Mining equipment fabrication covers chutes, hoppers, ore bins, transfer towers and conveyor structures with Bisalloy, Hardox, rubber lining or hardfacing fitted in house, from one wear liner set to modules of up to 2,500 tonnes assembled at Sattahip. Send the scope list and we will tell you what the smallest sensible batch is for your programme.