Industry News
Mandatory Emissions Reporting - Are Manufacturers Ready?
Scope one and two emissions reporting is becoming compulsory, and plant level metering is the starting point.

With climate related financial disclosures getting nearer, large Australian manufacturers are starting to plan how to manage mandatory reporting of their carbon emissions. Carbon emissions are already being tracked for the oil and gas sector by companies such as Palantir and Trafigura. The Australian government is shifting to align the country with jurisdictions such as Europe and the US in introducing mandatory sustainability reporting for large listed and unlisted entities and financial institutions, which would include climate emissions. The Australian Accounting Standards Board (AASB) will be responsible for developing Australian climate disclosure standards, which would closely align with the International Sustainability Standards Board’s (ISSB), IFRS S2 Climate related Disclosures. So, how will emissions reporting be implemented for the manufacturing industry and what needs to be reported? This blog will dive deeper into this topic.
Proposed Staged Approach
Group 1: 2024 to 25 onwards, entities required to report under Chapter 2M of the Corporations Act and that fulfil two of the three thresholds:
, over 500 employees;
, value of consolidated gross assets at the end of the financial year of the company and any entities it controls is $1 billion or more;
, consolidated revenue for the financial year of the company and any entities it controls is $500 million or more, AND entities required to report under Chapter 2M of the Corporations Act that are a ‘controlling corporation’ under the NGER Act and meet the NGER publication threshold.
Group 2: 2026 to 27 onwards, entities required to report under Chapter 2M of the Corporations Act and that fulfil two of the three thresholds:
, over 250 employees;
, value of consolidated gross assets at the end of the financial year of the company and any entities it controls is $500 million or more;
, consolidated revenue for the financial year of the company and any entities it controls is $200 million or more, AND entities required to report under Chapter 2M of the Corporations Act that are a ‘controlling corporation’ under the NGER Act and meet the NGER publication threshold.
Group 3: 2027 to 28 onwards Entities required to report under Chapter 2M of the Corporations Act and that fulfil two of the three thresholds:

, over 100 employees;
, value of consolidated gross assets at the end of the financial year of the company and any entities it controls is $25 million or more;
, consolidated revenue for the financial year of the company and any entities it controls is $50 million or more, AND entities required to report under Chapter 2M of the Corporations Act that are a ‘controlling corporation’ under the NGER Act.
Emission Content Disclosures
Scope 1 and 2 emissions
‘material’ climate related risks and opportunities, as well as how they identify, assess and manage those risks and opportunities (such as US steel and aluminium tariffs on carbon emissions)
information about ‘governance processes, controls and procedures’ used to monitor and manage the above risks and opportunities
information about the heavy steel fabrication company ‘s climate strategy and decision making, including disclosure of the company’s transition plans.
climate resilience assessments against at least two possible future states, one of which would need to be consistent with the global temperature goal set out in the Climate Change Act 2022 which is to contribute to ‘holding the increase in the global average temperature to well below 2°C above preindustrial levels and pursuing efforts to limit the temperature increase to 1.5°C above preindustrial levels’.
information about climate related targets and plan for achieving them, and progress to date.
The idea is that the new climate disclosure requirements would be published with companies’ annual financial reports.
Scope 3 emissions, the emissions generated indirectly by third parties, via the supply chain for example, are one of the more problematic reporting concerns. The government’s proposal suggests that reporting of the more elusive Scope 3 emissions would be phased in later, during the second reporting year, and kept from then onwards.
Final Words
At this point, manufacturing companies need to start identifying direct and indirect emission sources, climate related risks, and opportunities; as well as measures to mitigate climate impacts. Since a major part of a carbon emissions assessment is summarising and collecting data, research should be performed on robust data collection systems that include emissions data, energy consumption, heat induction bending services and other relevant metrics. It needs to be noted that no exceptions will be provided for carbon emission reporting by manufacturing firms, so it is best to get cracking early!
Further reading
Follow industrial project intelligence across the wider market on Project Atlas Intel.
How K999 can help
Where we fit the story
Trade policy, commodity cycles and energy markets decide when projects move, and they decide what gets fabricated. These articles collect the changes we track for our clients.
See our projects- 01
Work delivered for mining, energy, processing and manufacturing clients across Australia and Southeast Asia.
- 02
Fabrication in Rayong with assembly at Sattahip, shipping from Laem Chabang and Map Ta Phut.
- 03
Enquiries answered within 48 hours by our estimating team.
More on Industry News
All articlesRequest for quotation
Need fabricated steel to that standard?
Every enquiry is answered within 48 hours by our estimating team in Rayong. The priced quotation follows once drawings, quantities and standards are confirmed. Stainless steel fabrication, structural steel fabrication, pipe spooling, pressure vessels, steel tanks, mining equipment and conveyors, pig launchers, chutes and hoppers, send the package and we will price it.
Before you request a quotation
Steel fabrication quotation questions
What structural steel fabrication, pressure vessel and pipe spooling packages cost, what to send with an enquiry, and how delivery to site works.
Structural steel fabrication is priced from the section and plate tonnage, the detailing and drawing hours, welding and fitting manhours, NDT requirements, blast and coating system, packing and freight. Grade matters as much as weight: AS/NZS, ASTM, JIS and BS sections carry different mill prices, and heavy built up members take longer than rolled sections. Our Rayong workshop produces around 10,000 tonnes of structural steel fabrication a year, so a clear bill of materials is usually enough to price. Send the drawings and we answer within 48 hours; the priced quotation follows once quantities, standards and delivery dates are confirmed.
For steel fabrication work, send the drawings or IFC package, a bill of materials with material grades, the welding and NDT requirements, the coating specification, the delivery port and your site dates. Add the inspection and test plan, any third party inspection requirement, and whether trial assembly or match marking is needed. Where drawings are still in progress, a scope list with sizes, quantities and duty is enough to start, and the estimate is refined once the final package arrives. Every enquiry is answered within 48 hours, and the priced quotation is issued after scope, standards and quantities are confirmed.
Yes. Pressure vessel fabrication is carried out to ASME Section VIII Div. 1 under our ASME U stamp No. 43,462, or to AS/NZS and BS where the project specifies, covering separators, air receivers, water drums, waste heat recovery units and pig launchers. Steel tanks for fuel, biofuel, chemical, water and food duty are designed in house with our E Tank programme to API, ASME, BS and AS/NZS. Because structural steel, vessels, tanks and their supports are built in the same workshops, one enquiry can cover the vessel package, the tank package and the structural steel that carries them, with a single coating and documentation system and one shipment.
Steel fabrication Australia packages are scheduled from a 33,000 m2 Rayong yard with an 80,000 m2 assembly yard inside Sattahip port, so fabrication, trial assembly, blasting, coating and packing run in one place. Programme length depends on tonnage, material lead times, the coating system and inspection scope, and it is confirmed with the quotation. We quote FOB Laem Chabang, Map Ta Phut or Sattahip, or CIF and DAP to your Australian port, with packing lists, weights, lifting points and a data book per shipment. Staged deliveries can follow your site erection sequence instead of shipping everything at once.
There is no fixed minimum. Pipe spooling Australia packages run at up to 3,000 diameter inches per shift on SCH.40, from a single replacement spool to a full plant piping scope, with spools numbered, X rayed where specified and coated to match erection order. Mining equipment fabrication covers chutes, hoppers, ore bins, transfer towers and conveyor structures with Bisalloy, Hardox, rubber lining or hardfacing fitted in house, from one wear liner set to modules of up to 2,500 tonnes assembled at Sattahip. Send the scope list and we will tell you what the smallest sensible batch is for your programme.







