All articles

Manufacturing & Technology

Maruichi Stainless Tube Building $75M Plant in Texas

Maruichi Stainless Tube Texas Corp. is planning to build a 125,000 square foot, state of the art manufacturing facility in Seguin. The Seguin Economic Development Corp. and the city of...

15 Oct 20222 min read
Maruichi Stainless Tube Building $75M Plant in Texas

Maruichi Stainless Tube Texas Corp. is planning to build a 125,000 square foot, state of the art manufacturing facility in Seguin. The Seguin Economic Development Corp. and the city of Seguin have announced Maruichi expects to break ground on the project at the beginning of 2023 and be completed at the beginning of 2024. The project will represent a total capital investment of $75 million and will result in the creation of at least 106 new jobs over a two year period. Products produced by the company are used in power plants, the chemical industry, the semiconductor industry, hydrogen gas stations, the automotive industry and structural machinery.

Maruichi Stainless Tube Building $75M Plant in Texas
K999 workshop, Rayong

“Maruichi is very excited to expand our manufacturing operations in Seguin, Texas”, said Takashi Onishi, president for Maruichi Stainless Tube Co. LTD. “Strategic location, access to a skilled workforce, and the partnership and genuine support we’ve received from the SEDC Board of Directors, the Seguin City Council and city staff helped solidify Maruichi’s decision to locate this project in Seguin. We look forward to contributing to the betterment of the city’s economy and becoming the newest member of the business community.” Maruichi Stainless Tube Texas Corp.’s future Seguin facility will produce seamless stainless steel precision tube via steel fabrication to support customers in the semiconductor industry. The demand for stainless steel precision bright annealed, or BA, tubes used for semiconductor manufacturing is significantly increasing due to global increase in semiconductor demand.

The Seguin facility will help Maruichi further meet demand in the United States from multiple construction and mining projects for large scale semiconductor manufacturing plants and mining plant and equipment, according to a press release from the city of Seguin. “We are delighted that Maruichi has decided to build their new manufacturing facility in Seguin, Texas. This project will help create excellent employment opportunities for our residents and help grow and diversify our economic base. We are proud that they have chosen to do business in the city of Seguin” Seguin Mayor Donna Dodgen said. Maruichi will build the Seguin facility on a 33 acre site to be purchased from the SEDC. The site is situated between Eighth Street and Guadalupe Street, just south of I 10, within the Rio Nogales Industrial Park. The SEDC Board of Directors and Seguin City Council approved a purchase and sale agreement during meetings held Sept. 6.

The SEDC Board of Directors and Seguin City Council also approved a performance based cash grant formalized through a performance agreement. Maruichi is required to meet capital investment, job creation and payroll performance benchmarks over the term of the agreement in order to realize the SEDC incentive, according to the city of Seguin. “Maruichi’s investment will help diversify and strengthen Seguin’s rapidly growing manufacturing and heavy steel fabrication industry,” said Josh Schneuker, executive director of the Seguin Economic Development Corp. “Economic development is a team sport, and today’s announcement would not be possible if it were not for the collaboration between the SEDC, the city, and our regional partner greater: SATX. The hard work over the past few months helped secure this project to the city of Seguin, Guadalupe County and the San Antonio Region.”

K999 Thailand carries out work of this kind through its steel fabrication capability team in Rayong.

Further reading

Follow hydrogen projects in Europe across the wider market on Project Atlas Intel.

Share this article LinkedIn X Facebook

How K999 can help

How we apply the technology

Faster quoting, cleaner detailing and fewer site surprises come from the tools we use before the first cut, and the articles here explain how those tools change the work.

3D modelling and detailing
  • 01

    3D modelling and shop detailing that resolves clashes before fabrication starts.

  • 02

    Fibre laser cutting for plate profiles, with nesting planned around the rolling schedule.

  • 03

    Project management that reports progress against the same model the client approved.

Request for quotation

Need fabricated steel to that standard?

Every enquiry is answered within 48 hours by our estimating team in Rayong. The priced quotation follows once drawings, quantities and standards are confirmed. Stainless steel fabrication, structural steel fabrication, pipe spooling, pressure vessels, steel tanks, mining equipment and conveyors, pig launchers, chutes and hoppers, send the package and we will price it.

Before you request a quotation

Steel fabrication quotation questions

What structural steel fabrication, pressure vessel and pipe spooling packages cost, what to send with an enquiry, and how delivery to site works.

Structural steel fabrication is priced from the section and plate tonnage, the detailing and drawing hours, welding and fitting manhours, NDT requirements, blast and coating system, packing and freight. Grade matters as much as weight: AS/NZS, ASTM, JIS and BS sections carry different mill prices, and heavy built up members take longer than rolled sections. Our Rayong workshop produces around 10,000 tonnes of structural steel fabrication a year, so a clear bill of materials is usually enough to price. Send the drawings and we answer within 48 hours; the priced quotation follows once quantities, standards and delivery dates are confirmed.

For steel fabrication work, send the drawings or IFC package, a bill of materials with material grades, the welding and NDT requirements, the coating specification, the delivery port and your site dates. Add the inspection and test plan, any third party inspection requirement, and whether trial assembly or match marking is needed. Where drawings are still in progress, a scope list with sizes, quantities and duty is enough to start, and the estimate is refined once the final package arrives. Every enquiry is answered within 48 hours, and the priced quotation is issued after scope, standards and quantities are confirmed.

Yes. Pressure vessel fabrication is carried out to ASME Section VIII Div. 1 under our ASME U stamp No. 43,462, or to AS/NZS and BS where the project specifies, covering separators, air receivers, water drums, waste heat recovery units and pig launchers. Steel tanks for fuel, biofuel, chemical, water and food duty are designed in house with our E Tank programme to API, ASME, BS and AS/NZS. Because structural steel, vessels, tanks and their supports are built in the same workshops, one enquiry can cover the vessel package, the tank package and the structural steel that carries them, with a single coating and documentation system and one shipment.

Steel fabrication Australia packages are scheduled from a 33,000 m2 Rayong yard with an 80,000 m2 assembly yard inside Sattahip port, so fabrication, trial assembly, blasting, coating and packing run in one place. Programme length depends on tonnage, material lead times, the coating system and inspection scope, and it is confirmed with the quotation. We quote FOB Laem Chabang, Map Ta Phut or Sattahip, or CIF and DAP to your Australian port, with packing lists, weights, lifting points and a data book per shipment. Staged deliveries can follow your site erection sequence instead of shipping everything at once.

There is no fixed minimum. Pipe spooling Australia packages run at up to 3,000 diameter inches per shift on SCH.40, from a single replacement spool to a full plant piping scope, with spools numbered, X rayed where specified and coated to match erection order. Mining equipment fabrication covers chutes, hoppers, ore bins, transfer towers and conveyor structures with Bisalloy, Hardox, rubber lining or hardfacing fitted in house, from one wear liner set to modules of up to 2,500 tonnes assembled at Sattahip. Send the scope list and we will tell you what the smallest sensible batch is for your programme.