Manufacturing & Technology
Minimising Warehouse Costs Using Density and Robotics
Just like any other property, the cost of warehousing is subject to the whims of supply and demand.

Just like any other property, the cost of warehousing is subject to the whims of supply and demand. AutoStore Business Development Manager for Australia and New Zealand, Julian Brancaccio said vacancy rates across commercial and industrial warehousing in Sydney are down to 0.04%. What makes that figure scarier is that it refers to stock that has already been built and the majority already leased. “We’reseeing rate rises of between $200 per square meter all the way up to almost $400 per square meter,” he said. “Customers are asking, ‘How can we get denser? Can we use conveyor systems to increase efficiency? How can we lower the price per square meter by making everything denser?’ That is one of the biggest trends we have seen. “Labor costs for processes like pipe fabrication Australia is another huge trend that’s forcing organisations to automate and reduce footprint at the same time.” One of the options for denser warehousing is cube storage. “Some solutions currently in the market are dense, however their racking only goes up to two and a half meters, so anything above is a wasted opportunity,” Brancaccio said.

When it comes to automation in intralogistics, robotics is the way forward. “Automation is known, but robotics is new. It is a wave that has come in the last five years to disrupt the market and provide a cheaper alternative,” says Julian. “There’s a lot of moving parts to this solution. For example, there are a lot of vendors that do not have a significant partner network to be able to support the structural steel fabrication products they have in the region. That is where a lot of these kinds of vendors and solutions fall short. They are not able to get their solution into the market and set up a reference site. “It’s one thing announcing a partnership with an integrator, but it’s another thing to have a reference site people can see. There is a lot of interest in terms of what the solutions are and how they work, but the customer wants to know who’s the edge?” Brancaccio believes an AutoStore solution can deliver ROI in just a few years. “If you fulfill 3000 Bins per day as an example, it takes around 15 people. For us in an AutoStore system you’reprobably looking at two people to pick 3000 Bins because everything becomes automated,” he said.
AutoStore is addressing the local market needs through Bin presentation. “There’s two things you’ve got to look for in a solution. There’s Bin density, how many Bins can fit on one square meter, and robot density,” Brancaccio said. “We’redenser and lower, which helps with fire compliance as well. AutoStore’s Bin density is 40 Bins per square meter which makes it the densest solution on the market. “The robot density of other solutions is usually around one robot per 50 square meters. On 1000 square meters, there are around 20 robots to fit that space and they can present around 30 Bins (plastic tubs) per hour. Comparatively the AutoStore system, on 1000 square meters we can have around 166 Robots and present 30 Bins per hour. Because a warehouse footprint is so expensive, AutoStore can help scale using that to get more out of it. Robot density is key.”
K999 Thailand carries out work of this kind through its steel fabrication capability team in Rayong.
Further reading
Follow Critical Minerals across the wider market on Project Atlas Intel.
How K999 can help
How we apply the technology
Faster quoting, cleaner detailing and fewer site surprises come from the tools we use before the first cut, and the articles here explain how those tools change the work.
3D modelling and detailing- 01
3D modelling and shop detailing that resolves clashes before fabrication starts.
- 02
Fibre laser cutting for plate profiles, with nesting planned around the rolling schedule.
- 03
Project management that reports progress against the same model the client approved.
More on Manufacturing & Technology
All articlesRequest for quotation
Need fabricated steel to that standard?
Every enquiry is answered within 48 hours by our estimating team in Rayong. The priced quotation follows once drawings, quantities and standards are confirmed. Stainless steel fabrication, structural steel fabrication, pipe spooling, pressure vessels, steel tanks, mining equipment and conveyors, pig launchers, chutes and hoppers, send the package and we will price it.
Before you request a quotation
Steel fabrication quotation questions
What structural steel fabrication, pressure vessel and pipe spooling packages cost, what to send with an enquiry, and how delivery to site works.
Structural steel fabrication is priced from the section and plate tonnage, the detailing and drawing hours, welding and fitting manhours, NDT requirements, blast and coating system, packing and freight. Grade matters as much as weight: AS/NZS, ASTM, JIS and BS sections carry different mill prices, and heavy built up members take longer than rolled sections. Our Rayong workshop produces around 10,000 tonnes of structural steel fabrication a year, so a clear bill of materials is usually enough to price. Send the drawings and we answer within 48 hours; the priced quotation follows once quantities, standards and delivery dates are confirmed.
For steel fabrication work, send the drawings or IFC package, a bill of materials with material grades, the welding and NDT requirements, the coating specification, the delivery port and your site dates. Add the inspection and test plan, any third party inspection requirement, and whether trial assembly or match marking is needed. Where drawings are still in progress, a scope list with sizes, quantities and duty is enough to start, and the estimate is refined once the final package arrives. Every enquiry is answered within 48 hours, and the priced quotation is issued after scope, standards and quantities are confirmed.
Yes. Pressure vessel fabrication is carried out to ASME Section VIII Div. 1 under our ASME U stamp No. 43,462, or to AS/NZS and BS where the project specifies, covering separators, air receivers, water drums, waste heat recovery units and pig launchers. Steel tanks for fuel, biofuel, chemical, water and food duty are designed in house with our E Tank programme to API, ASME, BS and AS/NZS. Because structural steel, vessels, tanks and their supports are built in the same workshops, one enquiry can cover the vessel package, the tank package and the structural steel that carries them, with a single coating and documentation system and one shipment.
Steel fabrication Australia packages are scheduled from a 33,000 m2 Rayong yard with an 80,000 m2 assembly yard inside Sattahip port, so fabrication, trial assembly, blasting, coating and packing run in one place. Programme length depends on tonnage, material lead times, the coating system and inspection scope, and it is confirmed with the quotation. We quote FOB Laem Chabang, Map Ta Phut or Sattahip, or CIF and DAP to your Australian port, with packing lists, weights, lifting points and a data book per shipment. Staged deliveries can follow your site erection sequence instead of shipping everything at once.
There is no fixed minimum. Pipe spooling Australia packages run at up to 3,000 diameter inches per shift on SCH.40, from a single replacement spool to a full plant piping scope, with spools numbered, X rayed where specified and coated to match erection order. Mining equipment fabrication covers chutes, hoppers, ore bins, transfer towers and conveyor structures with Bisalloy, Hardox, rubber lining or hardfacing fitted in house, from one wear liner set to modules of up to 2,500 tonnes assembled at Sattahip. Send the scope list and we will tell you what the smallest sensible batch is for your programme.




