Manufacturing & Technology
Train Jack System for Perth Metro Meets Deadlines
Vector Lifting and Bonfiglioli collaborated last year on a 15 month installation for the Perth Transport Authority (PTA), successfully delivering a high performance lifting solution to...

Vector Lifting and Bonfiglioli collaborated last year on a 15 month installation for the Perth Transport Authority (PTA), successfully delivering a high performance lifting solution to deadlines. The PTA had introduced a new fleet of trains and opened a new maintenance facility in Perth which needed 24 lifting jacks to be installed for the Perth Metro Network. Vector Lifting was awarded the tender for the supply and installation of a turnkey jack system, which elevates the train body off the track so the chassis and wheel set can be inspected, repaired, or exchanged as part of quality management. “This a new train with new requirements,” says Clinton Capelli, Mechanical Engineer, Vector Lifting. “Our jacks are synchronised and run through a controlled PLC system to lift all 24 jacks at the same time, same speed and to the right height.” “One of the reasons we were selected for this steel fabrication project, besides the fact that this is a highly specialised application, is that we are a local specialist manufacturer and are competitively priced,” adds Capelli.

To complete the jack system, Vector Lifting sought gearboxes from its long time supplier, Bonfiglioli. “We have developed a good relationship with Bonfiglioli because we believe in their product, it is robust and reliable. Bonfiglioli’s short lead time and rapid manufacture of custom gearboxes is ideal. They always offer us very good product and technical support, and understand the pressures of our business,” says Capelli. Bonfiglioli supplied Vector Lifting with 24 A Series helical gearboxes in one consignment, ensuring that Vector Lifting would meet PTA deadlines in spite of the pandemic’s challenges. “Bonfiglioli offer local stock and assembly and, for large orders which may require an import, they achieve a quick turnaround because of their wide international footprint and manufacturing set ups,” says Capelli.
Fred Whalley, Bonfiglioli’s State Sales Manager, says the A Series is suited to the jack system design so it required minimal adaption. “The helical bevel gear units offer a wide torque range and high efficiency in a compact and durable design,” says Whalley. “This enables smooth, easy handling of goods, even under the most demanding conditions. We have a large local stock holding but in the case of larger orders we can bring them in from Italy in a very short period.” Vector Lifting and Bonfiglioli have collaborated for 22 years. “Vector’s is a tried and tested model, they always order the right product for the application,” says Whalley about the Australian job crane specialist. “They boast a professional engineering team which is well versed in the principles of mechanical engineering. We enjoy working with them.”
The pairing with Bonfiglioli has benefited Vector Lifting, in return. “Customers choose our products because we collaborate with Bonfiglioli and other suppliers which help us deliver a good product that can stand the test of time,” adds Capelli. “We feel that Bonfiglioli mirrors what is important to us in their own company ethos and how they interact with customers.” He points to the gearbox supplier’s comprehensive customer support offering, which benefits Vector Lifting customers. This is a prolific partnership, with plans underway for further collaborative projects. One is the roll out of specialised winches (fitted with Bonfiglioli gearboxes) across several West Australian mines using mining plant and equipment, to provide functional and safety enhancements. “We are also in the process of designing specialised lifting equipment for other international rail operators,” concludes Capelli.
K999 Thailand carries out work of this kind through its steel fabrication capability team in Rayong.
Further reading
Follow industrial project intelligence across the wider market on Project Atlas Intel.
How K999 can help
How we apply the technology
Faster quoting, cleaner detailing and fewer site surprises come from the tools we use before the first cut, and the articles here explain how those tools change the work.
3D modelling and detailing- 01
3D modelling and shop detailing that resolves clashes before fabrication starts.
- 02
Fibre laser cutting for plate profiles, with nesting planned around the rolling schedule.
- 03
Project management that reports progress against the same model the client approved.
More on Manufacturing & Technology
All articlesRequest for quotation
Need fabricated steel to that standard?
Every enquiry is answered within 48 hours by our estimating team in Rayong. The priced quotation follows once drawings, quantities and standards are confirmed. Stainless steel fabrication, structural steel fabrication, pipe spooling, pressure vessels, steel tanks, mining equipment and conveyors, pig launchers, chutes and hoppers, send the package and we will price it.
Before you request a quotation
Steel fabrication quotation questions
What structural steel fabrication, pressure vessel and pipe spooling packages cost, what to send with an enquiry, and how delivery to site works.
Structural steel fabrication is priced from the section and plate tonnage, the detailing and drawing hours, welding and fitting manhours, NDT requirements, blast and coating system, packing and freight. Grade matters as much as weight: AS/NZS, ASTM, JIS and BS sections carry different mill prices, and heavy built up members take longer than rolled sections. Our Rayong workshop produces around 10,000 tonnes of structural steel fabrication a year, so a clear bill of materials is usually enough to price. Send the drawings and we answer within 48 hours; the priced quotation follows once quantities, standards and delivery dates are confirmed.
For steel fabrication work, send the drawings or IFC package, a bill of materials with material grades, the welding and NDT requirements, the coating specification, the delivery port and your site dates. Add the inspection and test plan, any third party inspection requirement, and whether trial assembly or match marking is needed. Where drawings are still in progress, a scope list with sizes, quantities and duty is enough to start, and the estimate is refined once the final package arrives. Every enquiry is answered within 48 hours, and the priced quotation is issued after scope, standards and quantities are confirmed.
Yes. Pressure vessel fabrication is carried out to ASME Section VIII Div. 1 under our ASME U stamp No. 43,462, or to AS/NZS and BS where the project specifies, covering separators, air receivers, water drums, waste heat recovery units and pig launchers. Steel tanks for fuel, biofuel, chemical, water and food duty are designed in house with our E Tank programme to API, ASME, BS and AS/NZS. Because structural steel, vessels, tanks and their supports are built in the same workshops, one enquiry can cover the vessel package, the tank package and the structural steel that carries them, with a single coating and documentation system and one shipment.
Steel fabrication Australia packages are scheduled from a 33,000 m2 Rayong yard with an 80,000 m2 assembly yard inside Sattahip port, so fabrication, trial assembly, blasting, coating and packing run in one place. Programme length depends on tonnage, material lead times, the coating system and inspection scope, and it is confirmed with the quotation. We quote FOB Laem Chabang, Map Ta Phut or Sattahip, or CIF and DAP to your Australian port, with packing lists, weights, lifting points and a data book per shipment. Staged deliveries can follow your site erection sequence instead of shipping everything at once.
There is no fixed minimum. Pipe spooling Australia packages run at up to 3,000 diameter inches per shift on SCH.40, from a single replacement spool to a full plant piping scope, with spools numbered, X rayed where specified and coated to match erection order. Mining equipment fabrication covers chutes, hoppers, ore bins, transfer towers and conveyor structures with Bisalloy, Hardox, rubber lining or hardfacing fitted in house, from one wear liner set to modules of up to 2,500 tonnes assembled at Sattahip. Send the scope list and we will tell you what the smallest sensible batch is for your programme.