A US$12 million fabrication and supply programme for CUEL supporting Chevron’s integrated wellhead platforms in the Gulf of Thailand, delivered across 2011 to 2020.
Over a decade of work for CUEL, K999 fabricated and supplied US$12 million of steelwork for Chevron’s integrated wellhead platform (WHP) programme in the Gulf of Thailand. The scope ran from structural steel and plate work to process modules, walkways and platform outfitting.
Offshore fabrication is defined by weight control, weld quality and inspection. Members were weighed and tracked against the platform weight budget, welding followed qualified procedures with NDT to offshore acceptance criteria, and the coating systems were selected for the marine atmosphere and splash zone the structures would live in.
Scope highlights
- US$12 million offshore fabrication programme, 2011 to 2020
- Structural steel, plate work and process module fabrication
- Weight control and dimensional reporting for offshore lifts
- Marine coating systems and offshore NDT acceptance criteria
FAQs
Yes. K999 has supplied modules, structural steel and outfitting for wellhead platforms in the Gulf of Thailand and FPSO projects overseas.
Members are weighed and recorded against the lift weight budget, with dimensional and weight reports issued for each module before shipment.
Multi coat marine systems applied over blasted steel, selected for the atmospheric, splash or submerged zone of each component.
The contract covered fabrication and supply for CUEL in Thailand, at a value of US$12,000,000. Work was released against approved shop drawings, with every assembly detailed, welded, coated and packed so the client's site team received a package they could erect rather than a pile of loose steel.
Fabrication took place at the K999 steel fabrication workshop in Rayong, Thailand, which sits on the eastern seaboard next to the Laem Chabang and Maptaphut industrial estates. The completed package for Thailand was blasted, coated, match marked and bundled in erection order, then shipped with packing lists, material certificates and inspection records so site receiving could be closed out without digging through crates.
Welding was performed to qualified procedures with NDT to the project's offshore acceptance criteria, and DNV 2.7-1 requirements applied where lifting frames or certified skids were involved. Where the client's specification named a particular code, weld procedure, coating system or inspection authority, the job was run to that document and the records were compiled per assembly for handover.
Quality control ran from goods in to packing: mill certificates recorded against heat numbers, weld procedures and welder qualifications verified before production, dimensional checks at each assembly stage, NDT on nominated welds, coating thickness and surface preparation records, and a final match mark and packing list. That documentation is what lets a client in Thailand accept the package without reinspection on arrival.
Offshore packages add weight control, marine coating systems and offshore NDT acceptance criteria to the usual fabrication discipline, because every kilogram and every weld is lifted, inspected and then lives in salt air. On top of that, the 2011 to 2020 delivery window meant production had to be planned around material lead times and shipping schedules, with inspection released progressively instead of at the end so the package kept moving toward Thailand.
Yes. Offshore fabrication is core workload rather than an occasional job, and our offshore record includes packages for clients such as CUEL. Send drawings, specifications and the required delivery date and our estimating team in Rayong will answer your enquiry within 48 hours, then follow with a fabrication and supply quotation once the package is clear.
Typical fabrication and supply packages run six to twelve weeks from approved drawings to shipment, depending on tonnage, material availability, coating requirements and inspection level. The programme is fixed at award against your delivery date, with progress reporting and inspection releases issued as the work proceeds so you can plan shipping and site erection.
More offshore projects
ESP GSP6 Project
Request for quotation
Your project could be next.
Every enquiry is answered within 48 hours by our estimating team in Rayong. The priced quotation follows once drawings, quantities and standards are confirmed. Stainless steel fabrication, structural steel fabrication, pipe spooling, pressure vessels, steel tanks, mining equipment and conveyors, pig launchers, chutes and hoppers, send the package and we will price it.