ESP GSP6 Project, Fabrication and supply by K999 Engineering & Construction
Projects

Energy

ESP GSP6 Project

B.E.C. · Maptaphut, Thailand · November 2009

Fabrication and supply for B.E.C. on the ESP GSP6 gas separation plant project at Maptaphut, Thailand.

The ESP GSP6 project took place at Maptaphut, Thailand’s petrochemical complex on the eastern seaboard near Rayong. K999 fabricated and supplied a US$500,000 package for B.E.C., covering structural steel, plate work and supports for the gas separation plant.

Because the site sits in the same industrial region as our workshop, delivery could be sequenced to the construction programme rather than shipped in one lot. Steel was fabricated, blasted, primed and delivered to Maptaphut in stages, letting the erection contractor work with minimum site storage.

Scope highlights

  • Gas separation plant structural and plate steelwork
  • Phased delivery matched to the construction programme
  • Blasting, priming and coating completed in the workshop
  • Local delivery to Maptaphut from the Rayong yard

FAQs

Yes. Thai projects are supplied directly from the Rayong yard with phased deliveries, which is faster and cheaper than export packaging.

In Rayong, on Thailand’s eastern seaboard near the Maptaphut petrochemical and Laem Chabang industrial complexes.

Yes. Deliveries are scheduled against the erection programme so site storage and double handling are minimised.

The contract covered fabrication and supply for B.E.C. in Maptaphut, Thailand, at a value of US$500,000. Work was released against approved shop drawings, with every assembly detailed, welded, coated and packed so the client's site team received a package they could erect rather than a pile of loose steel.

Fabrication took place at the K999 steel fabrication workshop in Rayong, Thailand, which sits on the eastern seaboard next to the Laem Chabang and Maptaphut industrial estates. The completed package for Maptaphut, Thailand was blasted, coated, match marked and bundled in erection order, then shipped with packing lists, material certificates and inspection records so site receiving could be closed out without digging through crates.

Welding followed qualified procedures under ASME Section IX, with pressure boundaries examined and hydro tested to the design conditions on the client's drawings. Where the client's specification named a particular code, weld procedure, coating system or inspection authority, the job was run to that document and the records were compiled per assembly for handover.

Quality control ran from goods in to packing: mill certificates recorded against heat numbers, weld procedures and welder qualifications verified before production, dimensional checks at each assembly stage, NDT on nominated welds, coating thickness and surface preparation records, and a final match mark and packing list. That documentation is what lets a client in Maptaphut, Thailand accept the package without reinspection on arrival.

Energy projects bring pressure boundaries, full material traceability and an inspection regime that follows each weld from procedure qualification through to hydrostatic test. On top of that, the November 2009 delivery window meant production had to be planned around material lead times and shipping schedules, with inspection released progressively instead of at the end so the package kept moving toward Maptaphut, Thailand.

Yes. Energy fabrication is core workload rather than an occasional job, and our energy record includes packages for clients such as B.E.C.. Send drawings, specifications and the required delivery date and our estimating team in Rayong will answer your enquiry within 48 hours, then follow with a fabrication and supply quotation once the package is clear.

Typical fabrication and supply packages run six to twelve weeks from approved drawings to shipment, depending on tonnage, material availability, coating requirements and inspection level. The programme is fixed at award against your delivery date, with progress reporting and inspection releases issued as the work proceeds so you can plan shipping and site erection.

Next project

FPSO MV20 + FPSO P-57

Request for quotation

Your project could be next.

Every enquiry is answered within 48 hours by our estimating team in Rayong. The priced quotation follows once drawings, quantities and standards are confirmed. Stainless steel fabrication, structural steel fabrication, pipe spooling, pressure vessels, steel tanks, mining equipment and conveyors, pig launchers, chutes and hoppers, send the package and we will price it.