Matindok Project, Fabrication and supply by K999 Engineering & Construction
Projects

Energy

Matindok Project

Pertamina · Sulawesi, Indonesia · August 2016

Fabrication and supply of process steelwork for Pertamina’s Matindok gas development in Sulawesi, Indonesia.

For Pertamina’s Matindok project in Sulawesi, K999 fabricated and supplied a US$450,000 package of process steelwork from the Rayong workshop. The scope covered structural steel, skid mounted assemblies and plate work built to the client’s drawings and Indonesian project specifications.

Gas plant work demands traceability. Heat numbers were recorded against every member, weld procedures were qualified before production started, and NDT results were compiled per assembly. The completed package was coated, packed and shipped to Indonesia with documentation structured for the client’s inspection team.

Scope highlights

  • Process plant structural steel and skid assemblies
  • Full material traceability by heat number
  • Qualified weld procedures and compiled NDT records
  • Coating, packing and shipping to Sulawesi, Indonesia

FAQs

Each member is linked to its mill certificate by heat number, and welds are tied to qualified procedures and inspection results in a compiled record book.

Yes. Skids, frames, supports and interconnecting plate work can be fabricated, preassembled and coated as a single shipped module.

Yes, including Pertamina in Indonesia, alongside oil and gas contractors such as CUEL, Baker Hughes and Expro.

The contract covered fabrication and supply for Pertamina in Sulawesi, Indonesia, at a value of US$450,000. Work was released against approved shop drawings, with every assembly detailed, welded, coated and packed so the client's site team received a package they could erect rather than a pile of loose steel.

Fabrication took place at the K999 steel fabrication workshop in Rayong, Thailand, which sits on the eastern seaboard next to the Laem Chabang and Maptaphut industrial estates. The completed package for Sulawesi, Indonesia was blasted, coated, match marked and bundled in erection order, then shipped with packing lists, material certificates and inspection records so site receiving could be closed out without digging through crates.

Welding followed qualified procedures under ASME Section IX, with pressure boundaries examined and hydro tested to the design conditions on the client's drawings. Where the client's specification named a particular code, weld procedure, coating system or inspection authority, the job was run to that document and the records were compiled per assembly for handover.

Quality control ran from goods in to packing: mill certificates recorded against heat numbers, weld procedures and welder qualifications verified before production, dimensional checks at each assembly stage, NDT on nominated welds, coating thickness and surface preparation records, and a final match mark and packing list. That documentation is what lets a client in Sulawesi, Indonesia accept the package without reinspection on arrival.

Energy projects bring pressure boundaries, full material traceability and an inspection regime that follows each weld from procedure qualification through to hydrostatic test. On top of that, the August 2016 delivery window meant production had to be planned around material lead times and shipping schedules, with inspection released progressively instead of at the end so the package kept moving toward Sulawesi, Indonesia.

Yes. Energy fabrication is core workload rather than an occasional job, and our energy record includes packages for clients such as Pertamina. Send drawings, specifications and the required delivery date and our estimating team in Rayong will answer your enquiry within 48 hours, then follow with a fabrication and supply quotation once the package is clear.

Typical fabrication and supply packages run six to twelve weeks from approved drawings to shipment, depending on tonnage, material availability, coating requirements and inspection level. The programme is fixed at award against your delivery date, with progress reporting and inspection releases issued as the work proceeds so you can plan shipping and site erection.

Next project

Sulphatreat Vessels

Request for quotation

Your project could be next.

Every enquiry is answered within 48 hours by our estimating team in Rayong. The priced quotation follows once drawings, quantities and standards are confirmed. Stainless steel fabrication, structural steel fabrication, pipe spooling, pressure vessels, steel tanks, mining equipment and conveyors, pig launchers, chutes and hoppers, send the package and we will price it.