McArthur River Mining, Fabrication and supply by K999 Engineering & Construction
Projects

Mining

McArthur River Mining

Milestone · Northern Territory · August 2013

Fabrication and supply for Milestone on the McArthur River zinc lead mine in the Northern Territory, Australia.

McArthur River is one of the world’s significant zinc lead operations, and its Northern Territory location makes freight and site access a logistical exercise. K999 fabricated and supplied the US$700,000 package from Rayong, with steelwork detailed for container shipping and remote site handling.

Plate work and structural assemblies were welded to project procedures, inspected and coated before packing. Bundles were labelled against the erection drawings so the site team could receive, identify and install each piece without opening every crate on arrival.

Scope highlights

  • Structural steel and plate work for a zinc lead concentrator
  • Detailing for container shipping and remote site handling
  • Inspection and coating completed before packing
  • Bundles labelled to erection drawings

FAQs

Yes. Members are detailed to container envelopes where possible, with break bulk shipping for oversize assemblies.

Each bundle carries a packing list and match mark references tied to the erection drawings, so pieces are identifiable without unpacking everything.

Yes, structural steel, plate work, chutes, launders and tankage for mineral processing plants.

The contract covered fabrication and supply for Milestone in Northern Territory, at a value of US$700,000. Work was released against approved shop drawings, with every assembly detailed, welded, coated and packed so the client's site team received a package they could erect rather than a pile of loose steel.

Fabrication took place at the K999 steel fabrication workshop in Rayong, Thailand, which sits on the eastern seaboard next to the Laem Chabang and Maptaphut industrial estates. The completed package for Northern Territory was blasted, coated, match marked and bundled in erection order, then shipped with packing lists, material certificates and inspection records so site receiving could be closed out without digging through crates.

Structural welding follows AWS D1.1 practice with visual and specified NDT, and members are dimensionally checked against approved shop drawings. Where the client's specification named a particular code, weld procedure, coating system or inspection authority, the job was run to that document and the records were compiled per assembly for handover.

Quality control ran from goods in to packing: mill certificates recorded against heat numbers, weld procedures and welder qualifications verified before production, dimensional checks at each assembly stage, NDT on nominated welds, coating thickness and surface preparation records, and a final match mark and packing list. That documentation is what lets a client in Northern Territory accept the package without reinspection on arrival.

Mining plant steelwork is judged on wear life, erection speed and how well it survives dust, wash down and constant material impact, so plate thickness, liner detail and bolted connections are all resolved in the workshop before shipment. On top of that, the August 2013 delivery window meant production had to be planned around material lead times and shipping schedules, with inspection released progressively instead of at the end so the package kept moving toward Northern Territory.

Yes. Mining fabrication is core workload rather than an occasional job, and our mining record includes packages for clients such as Milestone. Send drawings, specifications and the required delivery date and our estimating team in Rayong will answer your enquiry within 48 hours, then follow with a fabrication and supply quotation once the package is clear.

Typical fabrication and supply packages run six to twelve weeks from approved drawings to shipment, depending on tonnage, material availability, coating requirements and inspection level. The programme is fixed at award against your delivery date, with progress reporting and inspection releases issued as the work proceeds so you can plan shipping and site erection.

Next project

Karara Mining Project

Request for quotation

Your project could be next.

Every enquiry is answered within 48 hours by our estimating team in Rayong. The priced quotation follows once drawings, quantities and standards are confirmed. Stainless steel fabrication, structural steel fabrication, pipe spooling, pressure vessels, steel tanks, mining equipment and conveyors, pig launchers, chutes and hoppers, send the package and we will price it.