Stainless Steel Furnace Hood, 321 stainless fabrication by K999 Engineering & Construction
Projects

Manufacturing

Stainless Steel Furnace Hood

Liberty Bell Bay · Australia · December 2024

A 321 stainless steel furnace hood fabricated and supplied for Liberty Bell Bay in Australia, built for high temperature service in a smelter environment.

Liberty Bell Bay required a furnace hood in 321 stainless steel, a stabilised grade chosen for its resistance to intergranular corrosion at elevated temperature. The US$300,000 scope covered plate development, rolled and welded hood sections, stiffening and connection details, all fabricated at K999’s Rayong workshop.

Heat resistant stainless moves when it is welded, so the hood was assembled in staged sections with controlled heat input and check measurements between passes. Sections were trial fitted to confirm the site weld gaps and bolt alignments before being cleaned, passivated and crated for shipment to Tasmania.

Scope highlights

  • 321 stainless steel fabrication for elevated temperature service
  • Rolled and welded hood sections with staged, low distortion welding
  • Trial fit to confirm site weld gaps and bolted connections
  • Pickling and passivation of stainless weld zones

FAQs

321 is titanium stabilised, which resists intergranular corrosion and creep at sustained high temperature, the usual choice for smelter and furnace hoods.

Yes. Weld zones are cleaned and passivated so the corrosion resistant oxide layer is restored on the completed assembly.

Yes. The hood is broken into transportable sections with trial fitted joints, so site welding closes only the seams agreed at design stage.

The contract covered 321 stainless fabrication for Liberty Bell Bay in Australia, at a value of US$300,000. Work was released against approved shop drawings, with every assembly detailed, welded, coated and packed so the client's site team received a package they could erect rather than a pile of loose steel.

Fabrication took place at the K999 steel fabrication workshop in Rayong, Thailand, which sits on the eastern seaboard next to the Laem Chabang and Maptaphut industrial estates. The completed package for Australia was blasted, coated, match marked and bundled in erection order, then shipped with packing lists, material certificates and inspection records so site receiving could be closed out without digging through crates.

Welding followed qualified procedures with inspection to the project specification, and stainless grades were cleaned and passivated where corrosion resistance mattered. Where the client's specification named a particular code, weld procedure, coating system or inspection authority, the job was run to that document and the records were compiled per assembly for handover.

Quality control ran from goods in to packing: mill certificates recorded against heat numbers, weld procedures and welder qualifications verified before production, dimensional checks at each assembly stage, NDT on nominated welds, coating thickness and surface preparation records, and a final match mark and packing list. That documentation is what lets a client in Australia accept the package without reinspection on arrival.

Industrial manufacturing scopes are detailed around plant shutdown windows, dimensional fit to existing equipment and surfaces that will be seen and maintained every day. On top of that, the December 2024 delivery window meant production had to be planned around material lead times and shipping schedules, with inspection released progressively instead of at the end so the package kept moving toward Australia.

Yes. Manufacturing fabrication is core workload rather than an occasional job, and our manufacturing record includes packages for clients such as Liberty Bell Bay. Send drawings, specifications and the required delivery date and our estimating team in Rayong will answer your enquiry within 48 hours, then follow with a fabrication and supply quotation once the package is clear.

Typical fabrication and supply packages run six to twelve weeks from approved drawings to shipment, depending on tonnage, material availability, coating requirements and inspection level. The programme is fixed at award against your delivery date, with progress reporting and inspection releases issued as the work proceeds so you can plan shipping and site erection.

Next project

Blue Phoenix IBA Project

Request for quotation

Your project could be next.

Every enquiry is answered within 48 hours by our estimating team in Rayong. The priced quotation follows once drawings, quantities and standards are confirmed. Stainless steel fabrication, structural steel fabrication, pipe spooling, pressure vessels, steel tanks, mining equipment and conveyors, pig launchers, chutes and hoppers, send the package and we will price it.