Energy & Oil Gas
Determination of Oil Price
Supply, demand, inventory and futures positioning combine to set the crude benchmarks used in contracts.

Did you ever wonder how the price of oil is determined? Oil price movement is the in vogue topics as a consequence of the Russian invasion of Ukraine and the ongoing inflation of prices in countries like India. It is a testament to the importance of oil that, despite continued efforts to reduce its use and to find alternative green energy sources, oil remains one of the most in demand commodities globally. Rising oil prices is also an indicator of simultaneous price rise of daily essentials like fruits, wheat, vegetables etc. So, price determination of oil is crucial and it has the potential to affect the global economy. This blog will dive deeper in this regard.
With oil’s stature as a high demand global commodity comes the possibility that major fluctuations in price can have a significant economic impact. The two primary factors that impact the price of oil are:
Supply and demand

Market sentiment
The concept of supply and demand is as follows: As demand increases (or supply decreases) the price should go up and as demand decreases (or supply increases) the price should go down. The price of oil as we know it is actually set in the oil futures market. An oil futures contract is a binding agreement that gives one the right to purchase oil by the barrel at a predefined price on a predefined date in the future. Under a futures contract, both the buyer and the seller are obligated to fulfill their side of the transaction on the specified date.
The other key factor in determining oil prices is sentiment. Similar to stocks, the mere belief that demand for oil will increase dramatically at some point in the future can result in a dramatic increase in oil prices in the present, as speculators and hedgers alike snap up oil futures contracts. Of course, the opposite is also true. The market sentiment that oil demand will decrease at some point in the future can result in a dramatic decrease in prices in the present as oil futures contracts are sold (possibly sold short as well), which means that prices can hinge on little more than market psychology.
Basic supply and demand theory states that the more a product is produced, the more cheaply it should sell, all things being equal. If someone were to invent a well stimulation technique that could double an oil field’s output for only a small incremental cost, then with demand staying static, prices should fall. Actually, there have been periods of time when supply has increased. Oil production in North America was at an all time zenith in 2019, with fields in North Dakota and Alberta producing large quantities of oil. Since the internal combustion engine still predominates on American roads, and demand hasn’t kept up with supply, it is expected that the price of oil was low at that point in time. However, a completely different situation gave rise in this scenario. Production was high with oil being stored in pressure vessels, but distribution and refinement were not able to keep up with it. Hence, the price of oil did not fall as much as was expected. This is because refineries operate at 90% of capacity; the excess capacity is there to meet future oil demand.
As discussed, the factors around determining oil prices are manifold and at times, they may cause well known economics to become redundant. Considering the number of financial and geopolitical factors at play, guessing or “timing” oil prices in advance is difficult; however there have been cases where oil and gas prices have been manipulated. As the world becomes more interconnected, oil prices become more ubiquitous in our lives, from the oil price at the local gas station to the prices displayed on financial indices!
Further reading
Follow EPC procurement across the wider market on Project Atlas Intel.
How K999 can help
Process equipment for energy projects
Pressure containment and pipeline work carries the tightest documentation on the shop floor, and the articles here track the codes and market conditions behind that work.
Pressure vessels and tanks- 01
Pressure vessels, steel tanks and pig launchers built to ASME and client specifications.
- 02
Pipe spool fabrication with heat induction bending for long radius and tight radius bends.
- 03
Full traceability from mill certificates through weld maps to hydrotest records.
More on Energy & Oil Gas
All articlesRequest for quotation
Need fabricated steel to that standard?
Every enquiry is answered within 48 hours by our estimating team in Rayong. The priced quotation follows once drawings, quantities and standards are confirmed. Stainless steel fabrication, structural steel fabrication, pipe spooling, pressure vessels, steel tanks, mining equipment and conveyors, pig launchers, chutes and hoppers, send the package and we will price it.
Before you request a quotation
Steel fabrication quotation questions
What structural steel fabrication, pressure vessel and pipe spooling packages cost, what to send with an enquiry, and how delivery to site works.
Structural steel fabrication is priced from the section and plate tonnage, the detailing and drawing hours, welding and fitting manhours, NDT requirements, blast and coating system, packing and freight. Grade matters as much as weight: AS/NZS, ASTM, JIS and BS sections carry different mill prices, and heavy built up members take longer than rolled sections. Our Rayong workshop produces around 10,000 tonnes of structural steel fabrication a year, so a clear bill of materials is usually enough to price. Send the drawings and we answer within 48 hours; the priced quotation follows once quantities, standards and delivery dates are confirmed.
For steel fabrication work, send the drawings or IFC package, a bill of materials with material grades, the welding and NDT requirements, the coating specification, the delivery port and your site dates. Add the inspection and test plan, any third party inspection requirement, and whether trial assembly or match marking is needed. Where drawings are still in progress, a scope list with sizes, quantities and duty is enough to start, and the estimate is refined once the final package arrives. Every enquiry is answered within 48 hours, and the priced quotation is issued after scope, standards and quantities are confirmed.
Yes. Pressure vessel fabrication is carried out to ASME Section VIII Div. 1 under our ASME U stamp No. 43,462, or to AS/NZS and BS where the project specifies, covering separators, air receivers, water drums, waste heat recovery units and pig launchers. Steel tanks for fuel, biofuel, chemical, water and food duty are designed in house with our E Tank programme to API, ASME, BS and AS/NZS. Because structural steel, vessels, tanks and their supports are built in the same workshops, one enquiry can cover the vessel package, the tank package and the structural steel that carries them, with a single coating and documentation system and one shipment.
Steel fabrication Australia packages are scheduled from a 33,000 m2 Rayong yard with an 80,000 m2 assembly yard inside Sattahip port, so fabrication, trial assembly, blasting, coating and packing run in one place. Programme length depends on tonnage, material lead times, the coating system and inspection scope, and it is confirmed with the quotation. We quote FOB Laem Chabang, Map Ta Phut or Sattahip, or CIF and DAP to your Australian port, with packing lists, weights, lifting points and a data book per shipment. Staged deliveries can follow your site erection sequence instead of shipping everything at once.
There is no fixed minimum. Pipe spooling Australia packages run at up to 3,000 diameter inches per shift on SCH.40, from a single replacement spool to a full plant piping scope, with spools numbered, X rayed where specified and coated to match erection order. Mining equipment fabrication covers chutes, hoppers, ore bins, transfer towers and conveyor structures with Bisalloy, Hardox, rubber lining or hardfacing fitted in house, from one wear liner set to modules of up to 2,500 tonnes assembled at Sattahip. Send the scope list and we will tell you what the smallest sensible batch is for your programme.






