Energy & Oil Gas
DHL Welcomes Electric Prime Mover Truck
DHL Supply Chain has added a new electric prime mover truck to its fleet, the first of its kind on the road in New South Wales.

DHL Supply Chain has added a new electric prime mover truck to its fleet, the first of its kind on the road in New South Wales. The Volvo FM (Forward control medium height cab) electric prime mover will run 10 hour shifts to move larger consignments between DHL’s western Sydney warehouse sites and its transport hub. The 6×4 configuration features six batteries with 540 kWh (BOL) providing up to 666HP with 300 kilometre range and hauling up to 46 tons while emitting no carbon or particulate emissions from the vehicle. It adds to DHL’s growing Electric Vehicle (EV) fleet, which includes Volvo and SEA Electric light duty trucks and Terberg yard tractors, to provide zero tailpipe carbon emissions transport services and provide fabrication opportunities in the electric vehicle space. Combined with DHL’s Green Star accredited warehousing, featuring rooftop solar arrays and sustainable building features, it minimises total carbon emissions across logistics operations.

In a major boost to steel fabrication Australia, DHL will also add 10 electric vans before the end of 2024, for delivering goods to retailers. DHL Supply Chain Senior Vice President of Transport, Bill Rolfe, said the company’s Green Transport Policy is driving EV acquisitions worldwide. “We are excited to continue with our rollout of EVs to pursue our global targets. While these targets are a part of our Strategy 2030 to be the ‘Green Logistics of Choice’ ultimately, they are about providing the best outcomes for third party logistics customers who are relying on the sustainability prowess of their suppliers to enable more streamlined mandatory emissions reporting,” Rolfe said. “In addition to the lack of tailpipe emissions, these vehicles are also improving the amenity of the areas they pass through with no air pollution and relative silence, while also making for a safe working environment for our drivers.”
Volvo Trucks Australia Vice President Tom Chapman believes this proves fossil free transport is viable. “Partners such as DHL are proving that fossil free transport is not only possible, it is viable. It is businesses such as this that are paving the way towards a sustainable transport future and Volvo Trucks are proud to be a part of that journey,” Chapman said. DHL Group recently announced ‘Green Logistics of Choice’ as a new fourth bottom line, embedding sustainability into its Corporate Strategy 2030. Supported by a clear roadmap with transparent, time bound targets and KPIs integral to the Group’s strategic planning and decision making processes, DHL aims to continue assisting its customers on their decarbonisation journey by remaining the frontrunner in low carbon logistics operations for industries such as mining plant and equipment Australia.
K999 Thailand carries out work of this kind through its pressure vessel fabrication team in Rayong.
Further reading
Follow Oil & Gas across the wider market on Project Atlas Intel.
How K999 can help
Process equipment for energy projects
Pressure containment and pipeline work carries the tightest documentation on the shop floor, and the articles here track the codes and market conditions behind that work.
Pressure vessels and tanks- 01
Pressure vessels, steel tanks and pig launchers built to ASME and client specifications.
- 02
Pipe spool fabrication with heat induction bending for long radius and tight radius bends.
- 03
Full traceability from mill certificates through weld maps to hydrotest records.
More on Energy & Oil Gas
All articlesRequest for quotation
Need fabricated steel to that standard?
Every enquiry is answered within 48 hours by our estimating team in Rayong. The priced quotation follows once drawings, quantities and standards are confirmed. Stainless steel fabrication, structural steel fabrication, pipe spooling, pressure vessels, steel tanks, mining equipment and conveyors, pig launchers, chutes and hoppers, send the package and we will price it.
Before you request a quotation
Steel fabrication quotation questions
What structural steel fabrication, pressure vessel and pipe spooling packages cost, what to send with an enquiry, and how delivery to site works.
Structural steel fabrication is priced from the section and plate tonnage, the detailing and drawing hours, welding and fitting manhours, NDT requirements, blast and coating system, packing and freight. Grade matters as much as weight: AS/NZS, ASTM, JIS and BS sections carry different mill prices, and heavy built up members take longer than rolled sections. Our Rayong workshop produces around 10,000 tonnes of structural steel fabrication a year, so a clear bill of materials is usually enough to price. Send the drawings and we answer within 48 hours; the priced quotation follows once quantities, standards and delivery dates are confirmed.
For steel fabrication work, send the drawings or IFC package, a bill of materials with material grades, the welding and NDT requirements, the coating specification, the delivery port and your site dates. Add the inspection and test plan, any third party inspection requirement, and whether trial assembly or match marking is needed. Where drawings are still in progress, a scope list with sizes, quantities and duty is enough to start, and the estimate is refined once the final package arrives. Every enquiry is answered within 48 hours, and the priced quotation is issued after scope, standards and quantities are confirmed.
Yes. Pressure vessel fabrication is carried out to ASME Section VIII Div. 1 under our ASME U stamp No. 43,462, or to AS/NZS and BS where the project specifies, covering separators, air receivers, water drums, waste heat recovery units and pig launchers. Steel tanks for fuel, biofuel, chemical, water and food duty are designed in house with our E Tank programme to API, ASME, BS and AS/NZS. Because structural steel, vessels, tanks and their supports are built in the same workshops, one enquiry can cover the vessel package, the tank package and the structural steel that carries them, with a single coating and documentation system and one shipment.
Steel fabrication Australia packages are scheduled from a 33,000 m2 Rayong yard with an 80,000 m2 assembly yard inside Sattahip port, so fabrication, trial assembly, blasting, coating and packing run in one place. Programme length depends on tonnage, material lead times, the coating system and inspection scope, and it is confirmed with the quotation. We quote FOB Laem Chabang, Map Ta Phut or Sattahip, or CIF and DAP to your Australian port, with packing lists, weights, lifting points and a data book per shipment. Staged deliveries can follow your site erection sequence instead of shipping everything at once.
There is no fixed minimum. Pipe spooling Australia packages run at up to 3,000 diameter inches per shift on SCH.40, from a single replacement spool to a full plant piping scope, with spools numbered, X rayed where specified and coated to match erection order. Mining equipment fabrication covers chutes, hoppers, ore bins, transfer towers and conveyor structures with Bisalloy, Hardox, rubber lining or hardfacing fitted in house, from one wear liner set to modules of up to 2,500 tonnes assembled at Sattahip. Send the scope list and we will tell you what the smallest sensible batch is for your programme.






