Energy & Oil Gas
Drilling In South America Set To Peak During 2022
Drilling and completion activity in South America is expected to peak this year after a significant slowdown in 2020 due to the destruction in global demand brought on by the COVID 19...

Drilling and completion activity in South America is expected to peak this year after a significant slowdown in 2020 due to the destruction in global demand brought on by the COVID 19 pandemic, Rystad Energy claimed. According to Rystad, the rebound is more pronounced for offshore wells, primarily driven by an uptick in activity in Brazil and Guyana. With the overall recovery in drilling, South America is also winning back a global market share of new wells drilled, with offshore proving the standout sector.

New wells drilled with the support of steel fabrication in South America in 2014 contributed to 8 percent of new wells globally in the offshore sector and 4 percent in the onshore. Activity has been on a downward trend since then following the slump in oil prices in late 2014 and the following year. Onshore drilling activity had witnessed a steep drop in 2016 before stabilizing, while offshore drilling activity saw a relatively smoother decline. The number of new wells drilled in the region was hit again in 2020 with a 50 percent decrease recorded compared to the previous year, as the outbreak of Covid early in the year wreaked havoc on global markets. Drilling activity in South America in 2020 constituted only 2 percent of global onshore activity and 3 percent of offshore.
The number of new wells has since increased due to the return of demand and increase in prices of oil and gas. Activity is expected to peak this year before going on another downward trend towards the end of the decade, partially due to Brazil having very low discovered onshore volumes in the last six years, making it difficult to support long term growth. Offshore drilling activity in the region will remain at around 6 percent of global activity over the coming years, while onshore drilling will remain at around 3 percent. It should be noted that, while the offshore well count in the region is significantly lower than that of onshore, offshore production makes up nearly half of South America’s current output and is expected to exceed onshore production by 2024 due to increases in Brazil and Guyana. Advancements in drilling technologies are also expected to boost South America’s oil production in the years ahead.
Another region in South America that is seeing all time high activity is Argentina’s Vaca Muerta. The country recorded further production growth records, as operators step up fracking in the prolific Vaca Muerta shale formation in Neuquén. While activity is at an all time high, persistent supply chain bottlenecks suggest there is not a lot of room for incremental put on production activity in the next few quarters. Yet, with base decline remaining low given the basin’s early phase of development and the improving type curves, oil output is still poised for significant growth in the coming years. Rystad Energy research claims that the region’s production could exceed 300,000 barrels per day early next year, expanding further to 400,000 bpd in 2024, helping the country’s total rebound to levels not seen in nearly 20 years.
K999 Thailand carries out work of this kind through its pressure vessel fabrication team in Rayong.
Further reading
Follow Ports & Marine across the wider market on Project Atlas Intel.
How K999 can help
Process equipment for energy projects
Pressure containment and pipeline work carries the tightest documentation on the shop floor, and the articles here track the codes and market conditions behind that work.
Pressure vessels and tanks- 01
Pressure vessels, steel tanks and pig launchers built to ASME and client specifications.
- 02
Pipe spool fabrication with heat induction bending for long radius and tight radius bends.
- 03
Full traceability from mill certificates through weld maps to hydrotest records.
More on Energy & Oil Gas
All articlesRequest for quotation
Need fabricated steel to that standard?
Every enquiry is answered within 48 hours by our estimating team in Rayong. The priced quotation follows once drawings, quantities and standards are confirmed. Stainless steel fabrication, structural steel fabrication, pipe spooling, pressure vessels, steel tanks, mining equipment and conveyors, pig launchers, chutes and hoppers, send the package and we will price it.
Before you request a quotation
Steel fabrication quotation questions
What structural steel fabrication, pressure vessel and pipe spooling packages cost, what to send with an enquiry, and how delivery to site works.
Structural steel fabrication is priced from the section and plate tonnage, the detailing and drawing hours, welding and fitting manhours, NDT requirements, blast and coating system, packing and freight. Grade matters as much as weight: AS/NZS, ASTM, JIS and BS sections carry different mill prices, and heavy built up members take longer than rolled sections. Our Rayong workshop produces around 10,000 tonnes of structural steel fabrication a year, so a clear bill of materials is usually enough to price. Send the drawings and we answer within 48 hours; the priced quotation follows once quantities, standards and delivery dates are confirmed.
For steel fabrication work, send the drawings or IFC package, a bill of materials with material grades, the welding and NDT requirements, the coating specification, the delivery port and your site dates. Add the inspection and test plan, any third party inspection requirement, and whether trial assembly or match marking is needed. Where drawings are still in progress, a scope list with sizes, quantities and duty is enough to start, and the estimate is refined once the final package arrives. Every enquiry is answered within 48 hours, and the priced quotation is issued after scope, standards and quantities are confirmed.
Yes. Pressure vessel fabrication is carried out to ASME Section VIII Div. 1 under our ASME U stamp No. 43,462, or to AS/NZS and BS where the project specifies, covering separators, air receivers, water drums, waste heat recovery units and pig launchers. Steel tanks for fuel, biofuel, chemical, water and food duty are designed in house with our E Tank programme to API, ASME, BS and AS/NZS. Because structural steel, vessels, tanks and their supports are built in the same workshops, one enquiry can cover the vessel package, the tank package and the structural steel that carries them, with a single coating and documentation system and one shipment.
Steel fabrication Australia packages are scheduled from a 33,000 m2 Rayong yard with an 80,000 m2 assembly yard inside Sattahip port, so fabrication, trial assembly, blasting, coating and packing run in one place. Programme length depends on tonnage, material lead times, the coating system and inspection scope, and it is confirmed with the quotation. We quote FOB Laem Chabang, Map Ta Phut or Sattahip, or CIF and DAP to your Australian port, with packing lists, weights, lifting points and a data book per shipment. Staged deliveries can follow your site erection sequence instead of shipping everything at once.
There is no fixed minimum. Pipe spooling Australia packages run at up to 3,000 diameter inches per shift on SCH.40, from a single replacement spool to a full plant piping scope, with spools numbered, X rayed where specified and coated to match erection order. Mining equipment fabrication covers chutes, hoppers, ore bins, transfer towers and conveyor structures with Bisalloy, Hardox, rubber lining or hardfacing fitted in house, from one wear liner set to modules of up to 2,500 tonnes assembled at Sattahip. Send the scope list and we will tell you what the smallest sensible batch is for your programme.