All articles

Energy & Oil Gas

Major Controversies Impacting the Oil and Gas Industry

Environmental disputes, pricing conduct and licensing debates shape public and investor sentiment toward the sector.

5 Jul 20223 min read
Major Controversies Impacting the Oil and Gas Industry

Being one of the largest industries globally, developments in the oil and gas world have always received attention from the media. Whether it be various oil spills, new oil sources or oil price volatility as a result of geopolitical updates, oil and gas has been under the spotlight in most countries. As a result, controversies and scandals in this industry have been covered extensively over the years. This blog will deep dive into some of the biggest environmental and financial controversies which have taken place in the offshore industry and will look to analyse the resulting impact on the oil and gas sector.

Brazilian oil giant Petrobras has been the focus of corruption allegations as part of wider criminal investigations in a case known as Operation Car Wash. Named after the car wash that the operation was first discovered in in 2014, Operation Car Wash saw Petrobras accused of bribing politicians and political parties in Brazil and trying to conceal these payments from regulatory agencies and investors. The bribes were paid to secure contracts at inflated prices.

The US Department of Justice described the Car Wash scandal as “the largest foreign bribery case in history,” with $2.1bn siphoned from Petrobras in bribes and secret payments. In September 2018, the company reached a deal with the US and Brazilian authorities to settle longstanding investigations in the scandal. As part of the settlement deal, Petrobras agreed to pay $853.2m in penalties.

Major Controversies Impacting the Oil and Gas Industry
K999 workshop, Rayong

In December 2018, Nigeria filed a $1.092bn lawsuit against oil companies Shell and Eni over alleged fraudulent practices and cases of corruption. Nigeria contended that Shell and Eni engaged in bribery and conspiracy against the country, claiming that the companies diverged billions of dollars of potential revenue from the Nigerian people.

The lawsuit relates to money Shell and Eni used to purchase interest in the OPL 245 block. It is alleged that this money was paid to Malabu Oil and Gas, a company owned by former Nigerian Minister of Petroleum Dan Etete, where it was then used for bribes and kickbacks. Reynolds Porter Chamberlain solicitor Tom Hibbert, who represented Nigeria, said: “This claim reflects the determination and ongoing efforts of the Federal Republic of Nigeria to recover the very significant sums lost to corruption and the unlawful activity of Shell and Eni in this transaction.”

The biggest oil scandal in recent memory is the Deepwater Horizon oil spill, better known as the BP oil spill. The explosion at the BP owned Deepwater Horizon drilling rig offshore Mexico in 2010 killed 11 men and injured several others. The resulting oil spill is considered to be the largest in the history of the petroleum industry, releasing an estimated 4.9 million barrels of oil into the Gulf of Mexico.

Investigations following the oil spill revealed problems in BP’s administration that contributed to the disaster. In September 2014, US district judge Carl Barbier accused the company of wilful misconduct and gross negligence, ruling that BP had acted with “conscious disregard of known risks” and describing the company’s conduct as “reckless”.

The above incidents are some of the controversies which have had an adverse impact on the major oil and gas players and how they function. While this has led to negative publicity for stakeholders involved, the environmental and financial costs incurred have hindered the growth of the oil and gas industry (and other industries like pipe fabrication, detergents, plastics etc.) over the years. With the rise in alternative sources of energy, oil and gas needs an image overhaul in certain areas going forward!

K999 Thailand carries out work of this kind through its pressure vessel fabrication team in Rayong.

Further reading

Follow global industrial project database across the wider market on Project Atlas Intel.

Calculation tool

Run the numbers for this yourself with the free steel take-off calculator from Engineering Toolbox Australia. Treat the result as a first check, then confirm the final design with your engineer.

Share this article LinkedIn X Facebook

How K999 can help

Process equipment for energy projects

Pressure containment and pipeline work carries the tightest documentation on the shop floor, and the articles here track the codes and market conditions behind that work.

Pressure vessels and tanks
  • 01

    Pressure vessels, steel tanks and pig launchers built to ASME and client specifications.

  • 02

    Pipe spool fabrication with heat induction bending for long radius and tight radius bends.

  • 03

    Full traceability from mill certificates through weld maps to hydrotest records.

Request for quotation

Need fabricated steel to that standard?

Every enquiry is answered within 48 hours by our estimating team in Rayong. The priced quotation follows once drawings, quantities and standards are confirmed. Stainless steel fabrication, structural steel fabrication, pipe spooling, pressure vessels, steel tanks, mining equipment and conveyors, pig launchers, chutes and hoppers, send the package and we will price it.

Before you request a quotation

Steel fabrication quotation questions

What structural steel fabrication, pressure vessel and pipe spooling packages cost, what to send with an enquiry, and how delivery to site works.

Structural steel fabrication is priced from the section and plate tonnage, the detailing and drawing hours, welding and fitting manhours, NDT requirements, blast and coating system, packing and freight. Grade matters as much as weight: AS/NZS, ASTM, JIS and BS sections carry different mill prices, and heavy built up members take longer than rolled sections. Our Rayong workshop produces around 10,000 tonnes of structural steel fabrication a year, so a clear bill of materials is usually enough to price. Send the drawings and we answer within 48 hours; the priced quotation follows once quantities, standards and delivery dates are confirmed.

For steel fabrication work, send the drawings or IFC package, a bill of materials with material grades, the welding and NDT requirements, the coating specification, the delivery port and your site dates. Add the inspection and test plan, any third party inspection requirement, and whether trial assembly or match marking is needed. Where drawings are still in progress, a scope list with sizes, quantities and duty is enough to start, and the estimate is refined once the final package arrives. Every enquiry is answered within 48 hours, and the priced quotation is issued after scope, standards and quantities are confirmed.

Yes. Pressure vessel fabrication is carried out to ASME Section VIII Div. 1 under our ASME U stamp No. 43,462, or to AS/NZS and BS where the project specifies, covering separators, air receivers, water drums, waste heat recovery units and pig launchers. Steel tanks for fuel, biofuel, chemical, water and food duty are designed in house with our E Tank programme to API, ASME, BS and AS/NZS. Because structural steel, vessels, tanks and their supports are built in the same workshops, one enquiry can cover the vessel package, the tank package and the structural steel that carries them, with a single coating and documentation system and one shipment.

Steel fabrication Australia packages are scheduled from a 33,000 m2 Rayong yard with an 80,000 m2 assembly yard inside Sattahip port, so fabrication, trial assembly, blasting, coating and packing run in one place. Programme length depends on tonnage, material lead times, the coating system and inspection scope, and it is confirmed with the quotation. We quote FOB Laem Chabang, Map Ta Phut or Sattahip, or CIF and DAP to your Australian port, with packing lists, weights, lifting points and a data book per shipment. Staged deliveries can follow your site erection sequence instead of shipping everything at once.

There is no fixed minimum. Pipe spooling Australia packages run at up to 3,000 diameter inches per shift on SCH.40, from a single replacement spool to a full plant piping scope, with spools numbered, X rayed where specified and coated to match erection order. Mining equipment fabrication covers chutes, hoppers, ore bins, transfer towers and conveyor structures with Bisalloy, Hardox, rubber lining or hardfacing fitted in house, from one wear liner set to modules of up to 2,500 tonnes assembled at Sattahip. Send the scope list and we will tell you what the smallest sensible batch is for your programme.