All articles

Energy & Oil Gas

Saudi Arabia Cuts Oil Prices for Asia and Europe

Saudi Arabia cut oil prices for customers in Asia and Europe as coronavirus lockdowns and sagging economies cool energy demand and impact oil price determination in the two regions.

17 Sept 20222 min read
Saudi Arabia Cuts Oil Prices for Asia and Europe

Saudi Arabia cut oil prices for customers in Asia and Europe as coronavirus lockdowns and sagging economies cool energy demand and impact oil price determination in the two regions. For the first time in four months, state controlled Saudi Aramco has slashed prices of October crude oil exports for European and Asian buyers just a day after OPEC+ symbolically cut output for that same month by 100,000 bpd on global demand concerns.

On Monday, 5 September, OPEC+, the oil producers group that Riyadh leads along with Russia, endorsed a decision to cut the collective oil production target by 100,000 barrels per day (bpd) for October, despite Russia reportedly resisting such a move. The 23 nation alliance is seeking to stabilize oil markets and the steel fabrication industry amid faltering economies and rising inflation. In China, the world’s biggest crude importer, the spread of virus lockdowns is hurting manufacturers and retailers. Saudi Arabia sells most of its oil to Asia where China, Japan, South Korea and India are the biggest buyers.

Saudi Arabia Cuts Oil Prices for Asia and Europe
K999 workshop, Rayong

This would imply returning targeted production levels to the August quotas. The OPEC+ decision is largely symbolic for markets, sending a message that the cartel is ready to meet at any time and decide on any cuts it deems appropriate to “stabilize” oil prices. The price cut also comes shortly after Moscow announced it would increase shipments of oil leveraging pressure vessels to Asia in response to the G7’s plan to implement a price cap on Russian oil beginning on December 5th, when the European Union ban on Russian seaborne oil goes into effect. The price cap would remain in place for two months.

Aramco lowered its key Arab Light grade for next month’s shipments to Asian refineries from a record $9.80 a barrel to $5.85 a barrel above the Middle Eastern benchmark. That’s a decrease of almost $4 from September. Aramco lowered all grades to Northwest Europe and the Mediterranean, most of them by $2 a barrel. The company raised pricing for US buyers by 50 cents, except for Arab Light, which was kept unchanged.

The move was largely in line with traders’ expectations and follows a 25% drop in Brent crude futures in the past three months to below $95 a barrel. Despite signals of slowing consumption in many major economies, the global market remains tight. Many analysts forecast that demand will outstrip supply in the final quarter of this year, especially if Russia reacts to a G7 proposed cap on its oil prices by limiting exports. Saudi Energy Minister Prince Abdulaziz bin Salman said in an interview late last month that futures markets were “in a state of schizophrenia” following Russia’s invasion of Ukraine. They are giving “a false sense of security at times when spare capacity is severely limited and the risk of severe disruptions remains high,” he said.

Further reading

Follow Hydrogen across the wider market on Project Atlas Intel.

Share this article LinkedIn X Facebook

How K999 can help

Process equipment for energy projects

Pressure containment and pipeline work carries the tightest documentation on the shop floor, and the articles here track the codes and market conditions behind that work.

Pressure vessels and tanks
  • 01

    Pressure vessels, steel tanks and pig launchers built to ASME and client specifications.

  • 02

    Pipe spool fabrication with heat induction bending for long radius and tight radius bends.

  • 03

    Full traceability from mill certificates through weld maps to hydrotest records.

Request for quotation

Need fabricated steel to that standard?

Every enquiry is answered within 48 hours by our estimating team in Rayong. The priced quotation follows once drawings, quantities and standards are confirmed. Stainless steel fabrication, structural steel fabrication, pipe spooling, pressure vessels, steel tanks, mining equipment and conveyors, pig launchers, chutes and hoppers, send the package and we will price it.

Before you request a quotation

Steel fabrication quotation questions

What structural steel fabrication, pressure vessel and pipe spooling packages cost, what to send with an enquiry, and how delivery to site works.

Structural steel fabrication is priced from the section and plate tonnage, the detailing and drawing hours, welding and fitting manhours, NDT requirements, blast and coating system, packing and freight. Grade matters as much as weight: AS/NZS, ASTM, JIS and BS sections carry different mill prices, and heavy built up members take longer than rolled sections. Our Rayong workshop produces around 10,000 tonnes of structural steel fabrication a year, so a clear bill of materials is usually enough to price. Send the drawings and we answer within 48 hours; the priced quotation follows once quantities, standards and delivery dates are confirmed.

For steel fabrication work, send the drawings or IFC package, a bill of materials with material grades, the welding and NDT requirements, the coating specification, the delivery port and your site dates. Add the inspection and test plan, any third party inspection requirement, and whether trial assembly or match marking is needed. Where drawings are still in progress, a scope list with sizes, quantities and duty is enough to start, and the estimate is refined once the final package arrives. Every enquiry is answered within 48 hours, and the priced quotation is issued after scope, standards and quantities are confirmed.

Yes. Pressure vessel fabrication is carried out to ASME Section VIII Div. 1 under our ASME U stamp No. 43,462, or to AS/NZS and BS where the project specifies, covering separators, air receivers, water drums, waste heat recovery units and pig launchers. Steel tanks for fuel, biofuel, chemical, water and food duty are designed in house with our E Tank programme to API, ASME, BS and AS/NZS. Because structural steel, vessels, tanks and their supports are built in the same workshops, one enquiry can cover the vessel package, the tank package and the structural steel that carries them, with a single coating and documentation system and one shipment.

Steel fabrication Australia packages are scheduled from a 33,000 m2 Rayong yard with an 80,000 m2 assembly yard inside Sattahip port, so fabrication, trial assembly, blasting, coating and packing run in one place. Programme length depends on tonnage, material lead times, the coating system and inspection scope, and it is confirmed with the quotation. We quote FOB Laem Chabang, Map Ta Phut or Sattahip, or CIF and DAP to your Australian port, with packing lists, weights, lifting points and a data book per shipment. Staged deliveries can follow your site erection sequence instead of shipping everything at once.

There is no fixed minimum. Pipe spooling Australia packages run at up to 3,000 diameter inches per shift on SCH.40, from a single replacement spool to a full plant piping scope, with spools numbered, X rayed where specified and coated to match erection order. Mining equipment fabrication covers chutes, hoppers, ore bins, transfer towers and conveyor structures with Bisalloy, Hardox, rubber lining or hardfacing fitted in house, from one wear liner set to modules of up to 2,500 tonnes assembled at Sattahip. Send the scope list and we will tell you what the smallest sensible batch is for your programme.