Filtration Skids DNV2.7-1, Skid fabrication by K999 Engineering & Construction
Projects

Processing

Filtration Skids DNV2.7-1

Baker Hughes · Perth, Western Australia · March 2015

Offshorecertified DNV 2.7-1 filtration skids fabricated for Baker Hughes and shipped to Perth, Western Australia.

Baker Hughes needed filtration skids certified to DNV 2.7-1, the standard governing offshore service containers and lifting frames. K999 fabricated the US$100,000 skid package at the Rayong workshop, including the structural frame, lifting set, pipework supports and equipment mounting points.

DNV 2.7-1 certification depends on fabrication discipline: welding is performed by qualified welders to approved procedures, lifting padeyes are positioned to the certified design, and the frame is dimensionally verified before load testing. K999 completed the skids, prepared the surfaces and coatings for an offshore marine atmosphere, and issued the fabrication records the certifying body required.

Scope highlights

  • DNV 2.7-1 offshore skid fabrication and documentation
  • Certified lifting sets, padeyes and structural frames
  • Pipework supports and equipment mounting detail
  • Marine grade surface preparation and coating

FAQs

A lifting frame or container built and certified to DNV’s offshore standard, with designed lifting sets, structural verification and fabrication records accepted by a certifying authority.

Yes. Alongside DNV 2.7-1 skids we fabricate offshore modules, wellhead platform steelwork and process packages for the oil and gas industry.

A marine coating system applied over blasted steel, selected for the splash, atmospheric or sheltered zone the skid will operate in.

The contract covered skid fabrication for Baker Hughes in Perth, Western Australia, at a value of US$100,000. Work was released against approved shop drawings, with every assembly detailed, welded, coated and packed so the client's site team received a package they could erect rather than a pile of loose steel.

Fabrication took place at the K999 steel fabrication workshop in Rayong, Thailand, which sits on the eastern seaboard next to the Laem Chabang and Maptaphut industrial estates. The completed package for Perth, Western Australia was blasted, coated, match marked and bundled in erection order, then shipped with packing lists, material certificates and inspection records so site receiving could be closed out without digging through crates.

Welding followed qualified procedures under ASME Section IX, with pressure retaining and process welds examined by radiography, ultrasonic or dye penetrant testing as specified. Where the client's specification named a particular code, weld procedure, coating system or inspection authority, the job was run to that document and the records were compiled per assembly for handover.

Quality control ran from goods in to packing: mill certificates recorded against heat numbers, weld procedures and welder qualifications verified before production, dimensional checks at each assembly stage, NDT on nominated welds, coating thickness and surface preparation records, and a final match mark and packing list. That documentation is what lets a client in Perth, Western Australia accept the package without reinspection on arrival.

Process plant work is driven by piping and plate geometry, access for maintenance and the need for spools and vessels to arrive tagged to the isometrics rather than as loose steel. On top of that, the March 2015 delivery window meant production had to be planned around material lead times and shipping schedules, with inspection released progressively instead of at the end so the package kept moving toward Perth, Western Australia.

Yes. Processing fabrication is core workload rather than an occasional job, and our processing record includes packages for clients such as Baker Hughes. Send drawings, specifications and the required delivery date and our estimating team in Rayong will answer your enquiry within 48 hours, then follow with a fabrication and supply quotation once the package is clear.

Typical fabrication and supply packages run six to twelve weeks from approved drawings to shipment, depending on tonnage, material availability, coating requirements and inspection level. The programme is fixed at award against your delivery date, with progress reporting and inspection releases issued as the work proceeds so you can plan shipping and site erection.

Next project

16” Pig Launcher GWF-1

Request for quotation

Your project could be next.

Every enquiry is answered within 48 hours by our estimating team in Rayong. The priced quotation follows once drawings, quantities and standards are confirmed. Stainless steel fabrication, structural steel fabrication, pipe spooling, pressure vessels, steel tanks, mining equipment and conveyors, pig launchers, chutes and hoppers, send the package and we will price it.