Solomon Project Firetail, Fabrication and supply by K999 Engineering & Construction
Projects

Mining

Solomon Project Firetail

Best Tech Engineering · Pilbara, Western Australia · May 2013

A US$5 million fabrication and supply contract for Best Tech Engineering on the Solomon Firetail iron ore project in the Pilbara.

For the Solomon Firetail project in Western Australia’s Pilbara, K999 fabricated and supplied US$5 million of structural steel and plant steelwork to Best Tech Engineering, working to Fortescue linked project specifications.

The scope was detailed for workshop completion: members were cut, drilled, welded and trial assembled in Rayong, then blasted and coated before shipping. Match marking and zone based packing let the site crew erect in sequence without waiting on missing pieces or reworking connections.

Scope highlights

  • US$5 million structural and plant steelwork contract
  • Drilled and trial assembled connections for site fit up
  • Blasting, coating and zone based packing in the workshop
  • Documentation aligned to project inspection requirements

FAQs

Detailing support, cutting, drilling, welding, trial assembly, surface preparation, coating, marking, packing, export documentation and freight preparation.

Yes. Much of our work is delivered to EPC contractors and engineering houses such as Best Tech Engineering, Laing O’Rourke and SNC Lavalin.

By proving connections in the workshop first, trial assembly, drilled holes and match marks remove the usual causes of site rework.

The contract covered fabrication and supply for Best Tech Engineering in Pilbara, Western Australia, at a value of US$5,000,000. Work was released against approved shop drawings, with every assembly detailed, welded, coated and packed so the client's site team received a package they could erect rather than a pile of loose steel.

Fabrication took place at the K999 steel fabrication workshop in Rayong, Thailand, which sits on the eastern seaboard next to the Laem Chabang and Maptaphut industrial estates. The completed package for Pilbara, Western Australia was blasted, coated, match marked and bundled in erection order, then shipped with packing lists, material certificates and inspection records so site receiving could be closed out without digging through crates.

Structural welding follows AWS D1.1 practice with visual and specified NDT, and members are dimensionally checked against approved shop drawings. Where the client's specification named a particular code, weld procedure, coating system or inspection authority, the job was run to that document and the records were compiled per assembly for handover.

Quality control ran from goods in to packing: mill certificates recorded against heat numbers, weld procedures and welder qualifications verified before production, dimensional checks at each assembly stage, NDT on nominated welds, coating thickness and surface preparation records, and a final match mark and packing list. That documentation is what lets a client in Pilbara, Western Australia accept the package without reinspection on arrival.

Mining plant steelwork is judged on wear life, erection speed and how well it survives dust, wash down and constant material impact, so plate thickness, liner detail and bolted connections are all resolved in the workshop before shipment. On top of that, the May 2013 delivery window meant production had to be planned around material lead times and shipping schedules, with inspection released progressively instead of at the end so the package kept moving toward Pilbara, Western Australia.

Yes. Mining fabrication is core workload rather than an occasional job, and our mining record includes packages for clients such as Best Tech Engineering. Send drawings, specifications and the required delivery date and our estimating team in Rayong will answer your enquiry within 48 hours, then follow with a fabrication and supply quotation once the package is clear.

Typical fabrication and supply packages run six to twelve weeks from approved drawings to shipment, depending on tonnage, material availability, coating requirements and inspection level. The programme is fixed at award against your delivery date, with progress reporting and inspection releases issued as the work proceeds so you can plan shipping and site erection.

Next project

McArthur River Mining

Request for quotation

Your project could be next.

Every enquiry is answered within 48 hours by our estimating team in Rayong. The priced quotation follows once drawings, quantities and standards are confirmed. Stainless steel fabrication, structural steel fabrication, pipe spooling, pressure vessels, steel tanks, mining equipment and conveyors, pig launchers, chutes and hoppers, send the package and we will price it.