ENERGY June 2025 / Engineering Solutions/ US$100,000/Ethiopia, Africa
The portable waste management incinerator for the Kurmuk Gold Mine demonstrates K999 Engineering & Construction Co., Ltd.’s capability in delivering reliable, environmentally responsible solutions for the mining sector.
Designed for efficient waste treatment in remote locations, the system supports sustainable mining operations while maintaining full compliance with international environmental and safety standards.
Project Overview
Client: DRA Global South Africa Design & Engineering: Engineering Solutions International Co., Ltd.
Fabrication Details
The incinerator was fabricated and fully assembled at K999’s 33,000 m² facility in Rayong, Thailand, where it underwent comprehensive testing and quality assurance before shipment.
Key Features:
Engineered for long-term efficiency and durability
Portable design adaptable to remote mine site conditions
Compliant with international waste management regulations
Successfully completed Factory Acceptance Test (FAT) and final inspection
