Pig Launchers & Receivers offer a safe and effective means of introducing and removing pipeline pigs from piping systems. Whether there is a requirement to Pig the line on a regular basis, a need to maintain peak operational efficiencies or volatility of the media being transferred, considerations for operator safety, scheduled pipeline maintenance and/or inspection. K999 Engineering and Construction  Co.  Ltd. can provide a solution.

Pig Launchers & Receivers are used across a number of industries including:

Agro-business production,  aquaculture intake pipelines, aluminium slurry lines, chemical production, desalination plants, fire service mains, food production, gas, transmission pipelines, gas process pipelines, lube oil production, mining slurry pipelines, onshore oil pipelines  offshore oil pipelines, pulp & paper production,  petrochemical, paint production, seawater pipelines, sewerage pipelines, slurry transfer pipelines, aswell as mains water  and wastewater pipelines

Pig Launchers & Receivers can be designed to suit specific pressure or temperature and media requirements along with conformance to Australian and International Design Codes and Standards.

A range of materials including Carbon steel, Stainless steel, Duplex stainless steel, Super Duplex stainless steel, Aluminium, PE, HDPE, GRP and others are available.

An important part of Pig Launcher & Receiver design is the access hatch, or more commonly referred to as the quick opening closure. This component enables operators to access to the vessel for the purpose of inserting or removing pipeline pigs and is critical in terms of safety, operability, effectiveness and reliability.

Our Projects

Bassari Mining Project

MINING 2022 / Mincore/ US$600,000/Senegal, Africa

Blue Phoenix IBA Project

PROCESSING April 2023 / Kerman Consulting / US$250,000 / Perth, Australia