Thailand's energy transition is being built with ordinary steel and exceptional schedule pressure. K999 fabricates electrolyser and process skids, solar mounting structures, biomass boiler steelwork, biogas plant equipment and wind tower internals, bringing the same code welding and traceability to renewable projects.

Green Energy fabrication by K999 Thailand

New plants, proven steelwork

Hydrogen and electrolyser skids, solar structures, biomass and waste to energy steelwork, built for projects that cannot afford a fabrication delay.

Hydrogen projects are process plants with new materials attached. Electrolyser skids arrive as vendor packages that need pipework, cooling, gas handling and structural frames around them; we fabricate those interfaces in carbon and stainless, test them, and deliver a module the site team can set down and connect.

Solar and wind work is a repetition and logistics problem. Mounting structures, inverter platforms, transformer frames and tower internals are fabricated to tight drilling tolerances so thousands of connections line up, hot dip galvanised where the specification calls for it, and packed in installation sequence to reduce site double handling.

Biomass, biogas and waste to energy plants combine high temperature steelwork with pressure equipment: boiler supports, fuel handling structures, flue ducting, digester tanks and gas pipework. We fabricate to the applicable code, manage the coating system against the service temperature, and sequence deliveries around the commissioning plan.

What we fabricate

  • Electrolyser and hydrogen process skids
  • Solar mounting structures and inverter platforms
  • Wind tower internals, ladders and access steel
  • Biomass boiler steelwork and flue ducting
  • Biogas digester tanks and gas pipework
  • Hot dip galvanising and coating coordination

Typical applications

  • 01Green hydrogen production plants
  • 02Solar farms and rooftop PV structures
  • 03Biomass and waste to energy boilers
  • 04Biogas and anaerobic digestion plants
  • 05Battery energy storage equipment platforms
  • 06Wind farm balance of plant steelwork

hydrogen skid fabrication Thailand / electrolyser module fabrication / solar mounting structure fabrication Thailand / biomass boiler steelwork fabrication / biogas digester tank fabrication / hot dip galvanised steel structures / wind tower internals fabrication / renewable energy fabrication Rayong

Green Energy FAQs

Questions we are asked

Ten detailed answers on green energy fabrication, testing, delivery and documentation.

Electrolyser and hydrogen process skids, solar mounting structures and inverter platforms, wind tower internals, biomass boiler steelwork, flue ducting, biogas digester tanks and gas pipework, plus balance of plant structural steelwork.

Yes. We build the structural frame, cooling and gas handling pipework, supports and interfaces around vendor electrolyser packages, then pressure test and deliver a module that can be set down and connected on site.

Structures are usually fabricated in galvanised mild steel or aluminium sections depending on the design, with hot dip galvanising for long life in tropical conditions. Drilling and cutting are completed before galvanising so coating integrity is not broken on site.

Repetitive parts are produced from jigs and CNC drilled plates so holes align across the run, and batches are checked by sampling rather than by hope. Packing follows the installation sequence so the crew receives parts in the order they are erected.

Yes, including boiler support structures, fuel handling steelwork, flue and duct systems, air heaters and access platforms. Coating systems are selected for the service temperature so the paint does not fail where the steel runs hot.

We fabricate digester tanks, roofs, agitator supports and gas pipework in carbon or stainless steel as the process requires, with gas tight testing and documentation included before delivery.

We manage the galvanising or painting subcontract as part of the package, control surface preparation, check coating thickness and repair any damage from handling. Coating records travel with the delivery.

Material certificates, weld maps and non destructive testing reports, dimensional records, coating and galvanising certificates, pressure test records and as built drawings, assembled in a data book for the owner's asset records.

Yes. We fabricate in Rayong and ship to project sites across the region and to Australia, with sea worth packing, marked lifts and documentation prepared for customs and for the receiving site.

Repetitive solar steel can move quickly once the design is fixed, often six to twelve weeks, while hydrogen skids and boiler structures typically run twelve to twenty weeks depending on vendor interfaces and testing requirements.