Oil and gas work is coded work. K999 fabricates pressure vessels, separators, pig launchers and receivers, process skids, structural steelwork and pipe spooling for upstream, midstream and downstream facilities, working under ASME with authorised inspection and full material traceability from mill certificate to heat number stamped on the shell.

Coded work, full traceability
Pressure vessels, process skids, pig launchers and coded pipework with ASME stamps, third party inspection and a data book that stands up to audit.
A coded vessel begins long before the first weld: design review against the applicable code, calculation of shell and head thickness, nozzle reinforcement and the weld joint detail that will be radiographed. We review the client package, raise queries early, and agree the inspection and test plan before cutting plate so everyone knows exactly which welds are shot, which are tested and who witnesses.
Fabrication follows the approved drawings with material traceability maintained through cutting, forming and welding. Longitudinal and circumferential seams are welded with qualified procedures, nozzles are set with reinforcement checked, and the vessel is hydrostatically tested and, where specified, given post weld heat treatment in a calibrated furnace with charted records.
Skids are assembled with pipework, valves, instruments, structural frames and lifting points, then flushed, tested and painted. Our data books include material certificates, weld maps with welder identification, non destructive testing reports, heat treatment charts, pressure test certificates, paint records and as built drawings, formatted the way client document control expects.
What we fabricate
- ASME pressure vessels, separators and accumulators
- Pig launchers, receivers and closures
- Process and metering skids with pipework and instruments
- Coded pipe spooling in carbon, stainless and Duplex
- Post weld heat treatment with charted records
- Hydrostatic testing, radiography and third party inspection
Typical applications
- 01Gas processing and compression facilities
- 02Wellhead and flowline equipment packages
- 03Refinery and terminal pipework
- 04LPG and condensate storage and transfer
- 05Fuel depots and aviation fuel systems
- 06Pipeline pigging and scraping stations
pressure vessel fabrication Thailand / ASME U stamp fabrication / pig launcher fabrication / oil and gas skid fabrication / process skid fabrication Rayong / coded pipe spooling Thailand / post weld heat treatment Thailand / separator vessel fabrication
Oil & Gas FAQs
Questions we are asked
Ten detailed answers on oil & gas fabrication, testing, delivery and documentation.
Yes. We fabricate vessels under ASME with authorised inspection, working to client design packages or to our own calculations where agreed. Shells, heads, nozzles and supports are built to the approved drawing with full material traceability and recorded testing.
Material certificates with heat numbers, weld maps and welder identification, non destructive testing reports, heat treatment charts where applicable, hydrostatic test certificates, dimensional reports, paint records and as built drawings, assembled to the client document numbering.
Yes, including barrels, closures, nozzles, saddles and skid mounting. We fabricate to the client specification with the correct closure interface, and we test and document the assembly to the same standard as a coded vessel.
Heat treatment is carried out to a qualified procedure with calibrated equipment and charted records showing heating rate, hold temperature, hold time and cooling rate. Thermocouple placement is agreed in advance and the charts are included in the data book.
Radiography, ultrasonic testing, magnetic particle and dye penetrant inspection are performed by qualified subcontracted technicians to the class in the inspection and test plan, with reports issued and reviewed before acceptance. Third party witnessing can be arranged.
Yes. We assemble pipework, valves, instruments, structural frames, cable trays and lifting points, then flush, pressure test and paint the skid. Instrument tags and loop numbers follow the client drawings so commissioning is a check rather than a discovery.
Carbon steel, low temperature carbon steel, stainless steels and Duplex and Super Duplex, with procedures qualified for each and for the thickness range involved. Alloy identity is checked at receipt, cutting and fit up to keep material mix ups out of the spool.
Spools are fabricated from isometrics with joint numbers allocated before welding, welders assigned by qualified procedure, and the specified percentage of joints radiographed or ultrasonically tested. Weld logs and maps track every joint to its welder and its inspection result.
Yes. Our certified inspectors provide inspection and expediting services in Thailand and neighbouring countries, which is useful when a client cannot travel for hold points at a sub vendor or at the fabrication shop.
Allow twelve to twenty weeks for a coded vessel or skid package from approved drawings, released material and an agreed inspection plan, with schedule driven mainly by material lead time, testing hold points and any heat treatment.
Request for quotation
Talk to us about your oil & gas package.
Send drawings, a scope or a sketch and our estimating team in Rayong will answer your enquiry within 48 hours, with a fabrication approach for your oil & gas project. The priced quotation follows once the scope is confirmed.