Industries / 07
Processing
Processing plants are assemblies of steel that must fit together on a concrete pad built by someone else. K999 fabricates the equipment and the structure that carries it: cyclones, thickener mechanisms, tanks, silos, transfer points, access platforms and modules, trial assembled and match marked so site work is bolting rather than cutting.

Plants that must keep running
Process plant steelwork, vessels, cyclones, thickeners and conveying equipment for mineral, aggregate, cement and industrial processing lines.
Process equipment fabrication starts with the interface survey. Anchor bolt centres, nozzle orientations, chute discharge heights and maintenance access are checked against the client drawings, and where the drawing is silent we raise it before fabrication rather than build a conflict. Structures are modelled for the lifting and transport case as well as the operating case.
Our shop handles the full mix: plate rolling for tanks and ducting, heavy fit up for crusher and mill structures, machining for flange faces and bearing seats, and surface protection matched to the duty. Modules are pre assembled with platforms, stairways, handrails and grating attached so the site crew receives a walkable, inspectable package.
Deliveries are sequenced to the site erection plan, with each module match marked to its neighbour and lifting points identified on the packing list. Dimensional reports, weld mapping and coating records travel with the steel, and our inspectors can attend site for fit up verification on the first module if the programme benefits from it.
What we fabricate
- Cyclone clusters, ducting and transition pieces
- Thickener tanks, bridges and drive supports
- Silos, bins and hopper fabrication
- Crusher, mill and screen structure steelwork
- Modular process plant with platforms and access
- Plate rolling, machining and surface protection
Typical applications
- 01Mineral processing and beneficiation plants
- 02Aggregate and quarry processing lines
- 03Cement and lime plant equipment
- 04Fertiliser granulation and handling plants
- 05Recycling and material recovery facilities
- 06Industrial process modules and pilot plants
process plant fabrication Thailand / cyclone fabrication / thickener tank fabrication / silo and hopper fabrication Thailand / modular process plant fabrication / aggregate plant steelwork / cement plant fabrication Rayong / plate rolling and ducting fabrication
Processing FAQs
Questions we are asked
Ten detailed answers on processing fabrication, testing, delivery and documentation.
Cyclone clusters and ducting, thickener tanks and bridges, silos, bins and hoppers, crusher and mill support structures, screen frames, transfer points, access platforms and complete modular process units for mineral, aggregate, cement and industrial plants.
We model the plant, survey the interface dimensions we are given, and trial assemble modules that connect to each other. Interfaces are match marked, and dimensional reports travel with the steel so the erection crew knows what was measured and to what tolerance.
Yes. We fabricate thickener tanks, walkway bridges, drive supports and cage structures, holding the drive interface dimensions to the vendor drawing so the mechanism drops into place without on site modification.
Shell courses and duct sections are rolled on plate rolls to the required radius, checked against a template, and fitted with longitudinal seams staggered between courses. Large tanks are trial assembled where transport allows, then match marked for site bolting or welding.
Yes. We agree a delivery schedule against the erection plan, mark each module with its position and sequence, and pack loose items by module rather than by type. That reduces site sorting and lets the crane follow the plan rather than the delivery truck.
Platforms, stairways, ladders, handrails, toe boards and grating are fabricated and, where practical, attached to the module before shipping. Access is designed to the client standard and to the maintenance needs of the equipment it serves.
We use replaceable liners, dead bed designs, chromium carbide overlay and ceramic tiles depending on the material and velocity, and we keep structural members out of the wear path so the liner is the only consumable.
Yes, in carbon or stainless steel, including square to round transitions, elbows, expansion joint spools and stiffened panels for pressure or vacuum duty. Ducting is trial fitted where it connects to vendor equipment.
Yes. Flange faces, bearing seats, drive interfaces and machined pads are produced to drawing tolerance, with machining sequenced after welding so distortion does not affect the final fit.
Ten to twenty weeks depending on tonnage, equipment interfaces, coating and the number of inspection hold points. Releasing long lead items such as wear plate, grating and vendor equipment early is the best way to protect the programme.
Request for quotation
Talk to us about your processing package.
Send drawings, a scope or a sketch and our estimating team in Rayong will answer your enquiry within 48 hours, with a fabrication approach for your processing project. The priced quotation follows once the scope is confirmed.